Laserfiche WebLink
Forward Landfill 2018 Expansion Project—Mitigation Monitoring and Reporting Program Checklist <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation <br /> Comments <br /> MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST <br /> INTRODUCTION: <br /> This Mitigation Monitoring and Reporting Program Checklist includes mitigation measures identified in this SEIR,as well as mitigation measures from <br /> four previous EIRs prepared for the project site,identified below as"Forward 1993", "Austin 1994", "Austin 2000","Forward 2002",and"Forward 2013". <br /> These previous EIRs are discussed in more detail in the introduction to Attachment I Mitigation Measures,above. <br /> Mitigation measures are grouped by the impact categories used in this EIR,and numbered sequentially. <br /> Mitigation Measures from this EIR are printed in normal font,with the original Mitigation Measure numbers from this EIR following in(parentheses). <br /> Mitigation measures from the previous EIRs are printed in italics and identified by their source(Forward 1993,Austin 1994,Austin 2000,Forward 2002,or <br /> Forward 2013),followed by the Mitigation Measure number in the relevant EIR. Because some impacts in this EIR and in previous EIRs do not require <br /> mitigation measures,the original mitigation measure numbers are not sequential. <br /> In some cases,mitigation measures from two or more of the previous EIRs that are substantially similar in content,or have been updated without <br /> otherwise being changed,have been combined. These mitigation measures are identified as"similar"and/or"updated". Mitigation measures from the <br /> four previous EIRs that have been replaced by equivalent measures in this EIR,or have already been implemented,are excluded from the list below. <br /> Page 46 <br />