My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill 2018 Expansion Project—Mitigation Monitoring and Reporting Program Checklist <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation <br /> Comments <br /> construction PMio Timing:Throughout life of project Air Pollution Control District <br /> Timing:Quarterly <br /> Control measures for Responsibility:Landfill operator Responsibility: San Joaquin Valley <br /> construction NOx Timing:Throughout life of project Air Pollution Control District <br /> and VOC Timing:Quarterly <br /> 20.(D.2a)Rule 2201 Responsibility:Landfill operator Responsibility: San Joaquin Valley <br /> for stationary source Timing:Throughout life of project Air Pollution Control District <br /> VOCs,NOx,and PMio Timing: Quarterly <br /> Emission reduction Responsibility:Landfill operator Responsibility: San Joaquin Valley <br /> credits Timing:Throughout life of project Air Pollution Control District <br /> Timing: Quarterly <br /> Dust control Responsibility:Landfill operator Responsibility: San Joaquin Valley <br /> (Regulation VIII) Timing:Throughout life of project Air Pollution Control District <br /> Timing: Quarterly <br /> 21.(D.2.b)Voluntary Emissions Responsibility:Landfill operator Responsibility: San Joaquin Valley <br /> Reduction Agreement Timing:As required Air Pollution Control District <br /> or other emissions- Timing: Quarterly <br /> reduction methods <br /> 22.(D.3)Odor control Responsibility:Landfill operator Responsibility: San Joaquin Valley <br /> during cannery Timing:Daily during cannery Air Pollution Control District <br /> waste processing waste processing Timing: Quarterly <br /> 23.(D.4)Report GHG Responsibility:Landfill operator Responsibility: San Joaquin Valley <br /> Emissions Timing:Annually Air Pollution Control District <br /> Timing:Annually <br /> Purchase GHG Responsibility:Landfill operator Responsibility: San Joaquin Valley <br /> credits Timing:Annually if required Air Pollution Control District <br /> Timing:Annually if required <br /> 24.(D.5)implement Mitigation See Mitigation N4easures See Mitigation Measures <br /> Page 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.