Draft Supplemental Environmental Impact Report Page I-2 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • Increase the remaining landfill capacity by approximately 32.0 million cubic yards <br /> (cy)to approximately 54.0 million cubic yards (cy). All of the increase would be Class <br /> II landfill space and would extend the landfill closure date to approximately 20392. <br /> • Relocate approximately 3,000 feet of the South Fork of South Littlejohns Creek(which <br /> currently traverses the landfill) to the southeastern boundaries of the site to provide <br /> additional separation of the creek from the landfill. The relocated creek will be ap- <br /> proximately 3,200 feet in length. <br /> • Allow cannery waste processing in areas of site that are not being used for disposal at <br /> the time. <br /> The Board of Supervisors certified the Forward Landfill Expansion Final Environmental Im- <br /> pact Report however the project application required an override to the Airport Land Use <br /> Plan by the County Board of Supervisors, which was not approved. <br /> In 2014, Forward proposed a smaller increase in permitted landfilling capacity that did not <br /> include the previously proposed expansion of landfilling operations on the 184-acre Brocchi- <br /> ni parcel. This proposed increase in landfill acreage was entirely within the boundary of the <br /> 567-acres permitted under the current land use permit (UP-00-0007/ER-00-0002) approved <br /> by the Board of Supervisors on April 8, 2003. A Draft Supplemental EIR (DSEIR)was circu- <br /> lated for this proposed expansion in December 2014 and comments were received, but For- <br /> ward abandoned the project before the Final Supplemental EIR was completed. <br /> The 2018 Expansion Project described in this Supplemental EIR is very similar to the 2014 <br /> proposal. It has a smaller increase in permitted landfilling capacity than the 2013 project and <br /> does not include the any expansion of landfilling operations onto the Brocchini parcel. The <br /> additional proposed landfill acreage is entirely within the boundary of the 567-acres permit- <br /> ted under the current land use permit (UP-00-0007/ER-00-0002) approved by the Board of <br /> Supervisors on April 8,2003. <br /> The 2018 Expansion Project would make the following changes to the currently permitted <br /> landfill: <br /> • Landfilling of an 8.7-acre parcel in the northeast portion of the site within the current- <br /> ly permitted landfill boundary. <br /> • Landfilling of approximately 8.6 acres in the south area <br /> • The south area expansion would require realigning about 2,900 feet of the South Fork <br /> of South Littlejohns Creek to a 3,300-foot alignment along the southern and eastern <br /> boundaries of the site, along with a new bridge across the creek. <br /> • The expansion would increase total landfill capacity by up to 8.12 million cubic yards <br /> beyond currently permitted levels, which would increase the remaining Class II land- <br /> 2 The 2013 MR estimated closure dates with and without that project of 2039 and 2021,respectively. However,2014 estimated closure dates <br /> with and without the 2012(previously proposed)project are 2045 and 2026,respectively. <br />