Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-14 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> by staying within the speed limit and travelling at a steady speed, especially for <br /> trips during the morning peak hours. <br /> Mitigation Measure C.2 could reduce the impact of increased truck noise but not to a <br /> level that would be less than significant. Other than Mitigation Measure C.2,no <br /> additional mitigations are available for this impact other than reducing project <br /> operations. Such a reduction is a substantial change to the proposed project and <br /> therefore is addressed as a component of Alternative 2 (Reduced Size/Reduced <br /> Daily Operations Alternative)in Chapter V of the 2013 EIR. <br /> C.3. On-Site Landfill Mitigation Measure C.3. Two options exist to mitigate the project's potentially Less than <br /> Equipment Noise significant impact from equipment operations, as follows: Significant <br /> (a)Heavy equipment operations shall not be conducted within 1,500 feet of any <br /> occupied residence after 10 p.m. and before 7 a.m.; or <br /> (b)Equipment operations within 1,500 feet of any residence after 10 p.m. or before 7 <br /> a.m. shall be fully shielded from the direct line of sight to the residence by an <br /> earthen berm whose crown elevation exceeds the elevation of the top of the exhaust <br /> stack. <br /> CA. Cumulative Traffic Significant and Unavoidable. No feasible mitigation measures are available to Significant and <br /> Noise Impacts reduce the project's contribution to cumulative noise impacts. Unavoidable <br /> D. AIR <br /> QUALITY/ODORS/ <br /> CLIMATE CHANGE <br /> Mitigation Measure D.1. The applicant shall comply with Regulation VIII Rule Less than <br /> D.1. Initial construction 8011 and implement the following control measures during construction: Significant <br /> particulate matter <br /> (PM10)and equipment • The applicant shall submit a Dust Control Plan subject to review and approval <br />