Draft Supplemental Environmental Impact Report Page II-16 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> trackout. <br /> Enhanced and additional control measures for construction emissions of PMIo shall <br /> be implemented where feasible. These measures include: <br /> • Limit traffic speeds on unpaved roads to 15 mph by signage and electronic <br /> speed monitoring devices. <br /> • Install sandbags or other erosion control measures to prevent silt runoff to <br /> public roadways from sites with a slope greater than one percent. <br /> • Install wheel washers for all exiting trucks, or wash off all trucks and <br /> equipment leaving the site. <br /> • Install wind breaks at windward side(s)of construction areas. <br /> • Suspend excavation and grading activity when winds exceed 20 mph. <br /> • Limit area subject to excavation, grading, and other construction activity at <br /> any one time. <br /> The applicant shall implement feasible control measures during construction to <br /> mitigate NOX and ROG emissions from construction equipment,which may include: <br /> • Require construction equipment used at the site to be equipped with <br /> catalysts/particulate traps to reduce particulate emissions. These <br /> catalysts/traps require the use of ultra-low sulfur diesel fuel (15 ppm). <br /> Currently, CARB has verified a limited number of these devices for <br /> installation in several diesel engine families to reduce particulate emissions. <br /> At the time bids are made, contractors must show that the construction <br /> equipment used is equipped with particulate filters and/or catalysts or <br /> prove why it is infeasible. <br /> • Use alternative fueled construction equipment,where feasible. <br />