Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-23 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> potential exposure to onsite personnel. <br /> E.S. Solid waste contains Proposed as Part of the Project: Less than <br /> pathogens that could . The landfill operator will follow legally required daily or alternative cover Significant <br /> spread by vectors. <br /> practices. <br /> • The landfill will continue to ban intact tires (which collect water and serve as <br /> a breeding ground for vectors)and large dead animals from disposal at the <br /> landfill. <br /> • Existing measures to discourage birds from the landfill will be continued. <br /> • Appropriate landfill personnel will periodically monitor the landfill for the <br /> presence of vectors, and landfill inspections will be documented in the <br /> landfill operations administrative file. <br /> E.6. The project would Identified in This EIR: Less than <br /> involve the use of Significant <br /> additional regulated or Mitigation Measure E.6: <br /> hazardous materials <br /> during the proposed (a)All applicable regulatory guidance originating after the Forward Landfill 2002 <br /> landfill expansion EIR shall be implemented; all hazardous materials shall be handled in accordance <br /> construction and with local, State, and federal regulations. <br /> operation. <br /> (b)The site HMMP, SWPPP, Operations Manual, and Wet Weather Plan shall serve <br /> to provide guidance in the use and handling of hazardous materials during the <br /> operations of the facility. <br /> E.7. Private groundwater Identified in This EIR: Less than <br /> production wells located Significant <br /> downgradient of the Mitigation Measure F.6, described under F. Hydrology and Water Quality,below, <br /> landfill may be affected applies to this impact. <br />