Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-25 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> 100-year flood event. <br /> • The project includes channel reconfiguration and localized flood protection <br /> berms to isolate the landfill surfaces from floodwaters. <br /> • The project design shall also include provision of replacement floodplain <br /> area and storage volume in an easement along the relocated South Branch of <br /> South Littlejohns Creek. <br /> • The channel and floodplain storage easement are designed to accommodate <br /> the 100-year,24-hour storm. The design would also include a three-foot <br /> freeboard. <br /> All of these measures have been incorporated into the design of the landfill <br /> expansion and relocated South Branch channel. Therefore,potential surface water <br /> drainage impacts would be reduced to a less than significant level. <br /> F.2. Uncontrolled Proposed as Part of the Project. Less than <br /> erosion from soil Significant <br /> stockpiles and landfill • The current drainage control structures and monitoring would continue to be <br /> surfaces, or inadvertent implemented to control erosion and sedimentation in the expansion areas. <br /> spills of refuse or other Proposed structural controls include the drainage control system and daily <br /> substances onsite, could cover. Operational controls include maintenance of the drainage system by <br /> contaminate surface keeping ditches clear of debris and excessive vegetation, and making needed <br /> water. repairs to drainage structures. Corrective measures would be implemented <br /> if inspections show excessive erosion or damage to drainage channels. Any <br /> areas showing erosive effects would be mitigated by removing loose debris <br /> followed by replacement, regrading, and compacting the area. Monitoring <br /> and protection against sediment from entering the Littlejohns Creek channel <br /> would be implemented, including the diversion of part of Littlejohns Creek <br /> farther away from the landfilled area. <br /> • In order to minimize sediment transport to Littlejohns Creek,landfill slopes, <br />