Draft Supplemental Environmental Impact Report Page II-36 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> from the San Joaquin River to enter the channel. After the relocation of the channel <br /> is completed and is ready to convey water, initial flows will be released at <br /> approximately 2 cubic feet/second (cfs), and shall be monitored to assure that water <br /> is released gradually through the channel for the first week after re-opening. This <br /> reduced flow would avoid causing a sediment plume. The restored channel shall <br /> not be opened prior to or during a significant rainfall event, and initial releases into <br /> the channel shall be coordinated with the Central San Joaquin Water Conservation <br /> District to insure no significant releases are scheduled during the initial opening of <br /> the channel. <br /> H.3. Potential "Take" of Identified in This EIR: Less than <br /> Giant Garter Snake. Mitigation Measure H-3. Participation in the SJMSCP affords the project proponent Significant <br /> Incidental Take authorization for giant garter snake pursuant to ESA, CESA and <br /> CEQA. Nonetheless, to minimize the potential for "incidental take" of giant garter <br /> snake,the following measures required by the SJMSCP (SJCOG 2000)shall be <br /> applied: <br /> A. A preconstruction survey for the species shall be conducted according to the <br /> requirements of the SJMSCP by a qualified biologist approved by the SJMSCP <br /> Technical Advisory Committee (TAC). If a giant garter snake is detected within the <br /> study area, the project will undertake Incidental Take Avoidance and Minimization <br /> Measures to protect the species as directed by the TAC. The project shall also <br /> comply with any mitigation requirements specified for giant garter snake habitat by <br /> the SJMSCP TAC (SJCOG 2000). Avoidance and minimization measures may <br /> include the following, as specified by the TAC: <br /> 1. Construction shall occur during the active period for the snake,between <br /> May 1 and October 1. Between October 2nd and April 30th,the SJMSCP <br /> Joint Powers Authority (JPA), with the concurrence of the Permitting <br /> Agencies' representatives on the TAC, shall determine if additional <br /> measures are necessary to minimize and avoid take. <br />