Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-50 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> The MLD will work with the County and a qualified archaeologist to develop a plan <br /> for the proper treatment of the human remains and associated funerary objects. <br /> Construction activities shall not resume until treatment has been completed. If <br /> recommendations are made and not accepted, during the mediation period, the <br /> Native American Heritage Commission shall mediate the issue and the Human <br /> Remains shall remain in the possession of the MLD. <br /> K. VISUAL QUALITY <br /> K.1: Effects on scenic No Impact. None required. No Impact <br /> routes and vistas. <br /> K.2: Effects of relocation Less than Significant. None required. Less than <br /> of the South Branch of Significant <br /> the South Fork of <br /> Littlejohns Creek. <br /> K.3. The increase in Proposed as Part of the Project. Significant and <br /> height and mass of the . Native or drought-tolerant trees, shrubs, and grasses will be used in Unmitigable <br /> proposed project would <br /> disrupt the physical landscaping to conform to the natural vegetation of the area. <br /> pattern and scale of the . Working faces of the landfill will be minimized to reduce their visibility. <br /> surrounding agricultural <br /> landscape. • To the extent feasible, the top and side slopes of the landfill will be seeded <br /> with a mixture of native grasses and wildflowers that would visually blend <br /> with plants at the project site. <br /> • Upon closure,the top and side slopes of the landfill will be planted with <br /> native grasses to the extent feasible. <br /> Implementation of these procedures would reduce the visual effects of the project; <br />