Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page III-31 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> the pipes. The drainage layer is separated from the operations layer above by a nonwoven <br /> geotextile to prevent migration of fine-grained material into the LCRS. <br /> The LCRS design for slopes greater than 15 percent consists of a geocomposite drainage net <br /> (GDN). GDN is used due to construction and stability concerns associated with placement of <br /> granular materials on steep slopes. No collection pipes are required on the side slopes because any <br /> leachate occurring on the slope would naturally flow down slope. <br /> Leachate collected in the LCRS would flow through the drainage layer to the pipes and <br /> subsequently into leachate collection sumps. Submersible pumps located in each sump would <br /> pump leachate from the LCRS to lined surface ponds,from which the leachate evaporates. <br /> Three leachate evaporation impoundments are permitted at the site, of which two are constructed <br /> and are currently in use. WMU F North is located in the southwest region of the existing Forward <br /> Landfill,just north of the South Fork. It was constructed in 1999 and provides containment for <br /> leachate from the active portions of the southern WMUs. The leachate impoundment was sized <br /> based on actual leachate generation records from 1991 to 1997 and has a design capacity of <br /> approximately 3.5 million gallons. WMU F West is located in the northern portion of the site, <br /> directly west of WMU FU-03. It was constructed in 2003 with a design capacity of 3.4 million <br /> gallons and receives leachate from the northern waste management units. A third impoundment, <br /> WMU F South,has not yet been constructed as no waste has yet been landfilled south of the South <br /> Fork. WMU F South would replace the existing WMU F North leachate impoundment. <br /> If,during the service life of the landfill,the demand on the leachate impoundment exceeds <br /> capacity,Forward would implement an alternative leachate management plan. Leachate in excess <br /> of the impoundment's capacity would either be pumped to temporary onsite tanks,trucked for off- <br /> site disposal at the City of Stockton Municipal Utility Department wastewater treatment plant <br /> located at 2500 North Navy Drive in Stockton,or trucked to another off-site licensed Treatment <br /> and Disposal Facility. Leachate stored in the temporary on-site tanks may be released back into the <br /> impoundment at a later date. <br /> Leachate Monitoring <br /> To monitor the LCRSs,Forward,Inc. conducts a leachate monitoring and sampling program in <br /> compliance with WDR Order No.R5-2014-0006. Quarterly and annual reports of the monitoring <br /> results are submitted to the DTSC,RWQCB, and the San Joaquin County Environmental Health <br /> Department,which is the Local Enforcement Agency(LEA). <br /> A leak detection system is also located under the sumps in the WMUs and the leachate <br /> impoundments. The leak detection system currently consists of suction cup lysimeters and pan <br /> lysimeters installed in all the Subtitle D lined WMUs with permanent sumps (i.e.WMU D-93,D-01, <br /> D-02,FU-03,FU-04,FU-05, and FU-06), as well as WMU-17. A suction lysimeter is a device that <br /> measures the soil pore water in the unsaturated zone,while a pan lysimeter measures the water <br /> that percolates down from below the sump. The lysimeters are sampled and tested in accordance <br /> with the site's WDRs. The former Austin Road Landfill unit has no leachate collection system and <br /> therefore no lysimeters. <br />