Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page III-36 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> Relocate South Fork of South Littlejohns Creek <br /> To create a contiguous disposal area and optimize landfill airspace,an approximately 3,000-foot <br /> reach of the South Fork of South Littlejohn Creek would be relocated to a new 3,400-foot long <br /> reach to be constructed along the eastern and southern boundaries of the landfill(see Figures III.C- <br /> 4,III.0-5,and III.0-6).The existing creek traversing the landfill is generally a trapezoidal channel <br /> with 10-to 12-foot banks and a 10-to 15-foot bottom width. The channel measures, on average, <br /> 60 feet from bank top to bank top. This equates to a 4.13-acre creek zone. According to the <br /> wetland delineation 16 approximately 1.25 acres of jurisdictional wetlands exists within the <br /> existing channel. The existing creek performs relatively well in terms of flood control.17 <br /> The creek relocation is intended to: (1)provide adequate flood control(i.e.,to have capacity to <br /> carry the 100-year flow within its banks),and (2)provide a stable channel design that meets or <br /> exceeds the functions and values of the existing creek.Under the proposed relocation,the existing <br /> channel would be moved approximately 1,000 feet to the south to accommodate the further <br /> development of the Forward Landfill (see Figures III.0-4,III.0-5,and III.0-6). The relocated creek <br /> would be approximately 3,400 feet in length and would have greater flood control ability than the <br /> existing channel.The new channel would be approximately 50 to 60 feet wide. <br /> The proposed relocation would create 1.87 acres of USCOE jurisdictional areas that are <br /> inundated at a regular basis.18 To address Federal Aviation Administration(FAA)concerns <br /> regarding creation of bird habitat,riparian habitat is proposed to be restored and/or created offsite <br /> rather than being incorporated within the relocated creek channel. Potential offsite mitigation sites <br /> include Westervelt Environmental Services'Bullocks Bend Mitigation Bank and Wildlands' <br /> Fremont Landing Conservation Bank,both in Yolo County, and the National Fish and Wildlife <br /> Foundations Sacramento District California In-Lieu Fee Program. <br /> Constructing the channel would require moving approximately 40,000 cubic yards of material. <br /> The creek relocation would use design and construction techniques similar to those used in the <br /> successful relocation of the North Fork of South Littlejohns Creek in 2002.Litter control in the <br /> relocated creek would follow established litter control practices at the site. A combination of <br /> monitored litter fences,screening,and litter pickers would be used. <br /> A new two-lane bridge("South Bridge')would cross the relocated creek from Austin Road, <br /> consisting of a clear span with engineered concrete footings located in the creek embankment. <br /> The bridge would be a concrete slab bridge or similar type construction. The bridge would be <br /> approximately 63 feet long by 28 feet wide, and allow for two twelve-foot-wide lanes with a <br /> two-foot shoulder. There would be one foot of freeboard between the 100-year water surface <br /> and the bridge soffit. <br /> 16 Monk&Associates,Environmental Consultants,Letter report to William H. Guthrie, U.S. Army Corps of <br /> Engineers, Sacramento District,June 22,2018(Monk&Associates,2018) <br /> 1'Project Description for Land Use Permit Application,Forward Landfill(Bryan A.Stirrat&Associates,2008). <br /> 18 Concept Design Report, South Branch of the South Fork ofLittle John Creek Relocation Project(Questa <br /> Engineering Corp,2017) <br />