Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page III-38 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> constructed in 2013 in the northeast portion of the landfill site, and is currently operated by <br /> Ameresco. <br /> In February 2014 the Regional Water Quality Control Board issued new Waste Discharge <br /> Requirements (WDRs)R5-2014-0006 for the Forward Landfill which included, among other <br /> modifications, lowering of base grades to the regulatory limit of five feet above the historical <br /> high groundwater level and the land application of cannery waste in the northern portion of the <br /> site (north of the North Fork of South Littlejohns Creek). <br /> Since the 2013 EIR was prepared,two additional associated projects were proposed, as <br /> described below. <br /> Forward is proposing a bridge crossing on the North Fork of South Littlejohn Creek. The bridge <br /> crossing is to allow access to the existing permitted borrow area and to the cannery waste land <br /> application area,both of which are located north of the creek.The operational need for the north <br /> bridge is independent of the proposed expansion. <br /> Ameresco is proposing an upgrade to the existing LFGTE facility at the Forward Landfill to meet <br /> PG&E's Rule 21 pipeline quality requirements for renewable natural gas from landfill gas.The <br /> process would treat gas that is compressed to around 100 to 200 psig. The process would <br /> remove CO2, N2, 02 and other trace constituents to increase the quality of the landfill gas. It is <br /> currently anticipated that the equipment required for this upgrade process would be located in <br /> the region of the former Covanta LFGTE plant, which was located near the western property <br /> boundary just south of the realigned north creek. The LFGTE upgrade also would involve a <br /> buried pipeline extending west of the landfill site to connect with an existing PG&E gas <br /> pipeline. The operational need for the LFGTE upgrade is independent of the proposed landfill <br /> expansion. The on-landfill LFGTE plant upgrade and mostly off-landfill pipeline would be subject <br /> to separate CEQA review by the County. <br /> H. APPLICABLE REGULATIONS AND PERMITS <br /> The existing Forward Landfill operates under a variety of permits issued by local, state, and <br /> federal governing agencies. These permits are identified in Table III.0-2 of the 2013 EIR <br /> (reproduced below), and have not changed since the 2013 EIR was prepared. <br /> The 2018 Expansion Project would require modifications to the following permits,which are <br /> described on pages III-34 and III-35 of the 2013 EIR: <br /> • Solid Waste Facilities Permits (SWFPs)for the landfill and the resource recovery facility <br /> (RRF)issued by the California Department of Resources Recycling and Recovery <br /> (CalRecycle)and San Joaquin County Environmental Health Department19; <br /> 19 On April 26,2012,Forward entered into a stipulated Settlement Agreement,Consent Judgment and Injunction with <br /> the San Joaquin County District Attorney whereby Forward agreed:(a)to report to the Local Enforcement Agency— <br /> the San Joaquin County Health Department(LEA)all tons of solid waste received at the Forward facility,(b)to <br /> inform the LEA if any haulers refused to advise the Forward scalehouse of the origin of their waste loads,(c)to not <br /> accept untreated medical waste,(d)to maintain its landfill gas monitoring program,and(e)to not exceed the vehicle <br /> limits in its Solid Waste Facilities Permit.A copy of this Settlement Agreement is available at the San Joaquin County <br /> Superior Court Clerk's office under Case No.CV034764. <br />