Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page III-40 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> Authority to Construct/Permit to Operate <br /> San Joaquin Valley Air Pollution Control <br /> District(SJVAPCD) <br /> Permit to Operate:Power Generation(landfill gas-to- SJVAPCD <br /> energy plant operated by Ameresco) <br /> Hazardous Waste Facility Postclosure Permit California Department of ToxicSubstances Control(DTSC) <br /> RCRA Hazardous Waste Facility Postclosure Permit Environmental Protection Agency (EPA) <br /> General Permit,Fire Permit Manteca-Lathrop Fire Department <br /> Depredation Permit(seagulls) U.S.Fish and Wildlife Service <br />