Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.D-15 <br /> Forward Inc. Landfill 2018 Revised Project <br /> Table IV.D-2: Air Quality Data Summary (2012-2016) For the Project Area' <br /> Monitoring Data by Year <br /> VMML A Pollutant CAAQS/ <br /> NAAQSZ 2012 2013 2014 2015 2016 <br /> Ozone <br /> Highest 1-Hour Average(ppm)3 0.09/- 0.097 0.080 0.090 0.094 0.102 <br /> Days of Exceedance 1 0 0 0 2 <br /> Highest 8-Hour Average(ppm)3 0.070/0.070 0.083 0.067 0.077 0.078 0.078 <br /> Days of Exceedance 5 0 4 2 2 <br /> Particulate Matter(PMlo) <br /> Highest 24-Hour Average(Mg/m')' <br /> 50/150 70.0 95.5 94.0 55.3 66.5 <br /> Estimated Days of Exceedance 17.9 58.2 18.0 24.5 30.6 <br /> Annual Average(µg/m3)3 20/- 22.8 32.0 24.5 28.0 26.5 <br /> Particulate Matter(PM25) <br /> Highest 24-Hour Average(µg/m3)3 -/35 60.4 66.5 56.8 58.8 43.7 <br /> Days of Exceedance 6.0 27.6 16.0 12.2 4.0 <br /> Annual Average(u g/m3)3 12/15 12.4 NA 12.3 12.3 NA <br /> SOURCE:CARB Air Quality Data Statistics(htto://www.arb.ca.gov/adam welaomehtml),2012-2016. <br /> NOTES:Values in bold underline are in excess of applicable standard.NA means data was not available for the given year. <br /> ' Ambient monitoring station for at Hazelton Street,Stockton. <br /> 2 California Ambient Air Quality Standards are not to be exceeded and National Ambient Air Quality Standards are not to be <br /> exceeded more than once per year. <br /> 3 ppm=parts per million;µg/ms=micrograms per cubic meter. <br /> A landfill gas to energy (LFGTE)plant operated in the northeast portion of the project site by <br /> Ameresco. The LFGTE converts landfill gas, a waste byproduct of landfill operations,into a <br /> useful energy source that would otherwise be destroyed through flaring without any beneficial <br /> reuse. The LFGTE plant produces approximately 4.2 MW of energy, enough to power <br /> approximately 6,000 to 8,000 single family homes every day. <br /> Ameresco is planning an upgrade to the existing LFGTE facility to meet PG&E's Rule 21 <br /> pipeline quality requirements for renewable natural gas from landfills. The process would treat <br /> gas that is compressed to around 100 to 200 psig. The process would remove CO2, N2,Oz and <br /> other trace constituents to increase the quality of the landfill gas. It is currently anticipated that <br /> the equipment required for this upgrade process would be located in the region of the former <br /> Covanta LFGTE plant, which was located near the western property boundary just south of the <br /> realigned north creek. The operational need for the LFGTE upgrade is independent of the <br /> proposed expansion. <br />