Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.D-19 <br /> Forward Inc. Landfill 2018 Revised Project <br /> • All land clearing, grubbing, scraping,excavation, land leveling, grading, cut and fill, and <br /> demolition activities shall be effectively controlled utilizing application of water or by <br /> presoaking. <br /> • When materials are transported offsite, all material shall be covered, or effectively <br /> wetted to limit visible dust emissions, and at least six inches of freeboard space from the <br /> top of the container shall be maintained. <br /> • All operations shall limit or expeditiously remove the accumulation of mud or dirt from <br /> adjacent public streets at the end of each workday. However, the use of blower devices <br /> is expressly forbidden, and the use of dry rotary brushes is expressly prohibited except <br /> where preceded or accompanied by sufficient wetting to limit the visible dust emissions. <br /> • Following the addition of materials to, or the removal of materials from, the surface of <br /> outdoor storage piles,said piles shall be effectively stabilized utilizing sufficient water <br /> or chemical stabilizer/suppressant. <br /> • Any site with 150 or more vehicle trips per day shall prevent carryout and trackout. <br /> Enhanced and additional control measures for construction emissions of PM10 shall be <br /> implemented where feasible. These measures include: <br /> • Limit traffic speeds on unpaved roads to 15 mph by signage and electronic speed <br /> monitoring devices. <br /> • Install sandbags or other erosion control measures to prevent silt runoff to public <br /> roadways from sites with a slope greater than one percent. <br /> • Install wheel washers for all exiting trucks, or wash off all trucks and equipment leaving <br /> the site. <br /> • Install wind breaks at windward side(s)of construction areas. <br /> • Suspend excavation and grading activity when winds exceed 20 mph. <br /> • Limit area subject to excavation, grading, and other construction activity at any one <br /> time. <br /> The applicant shall implement feasible control measures during construction to mitigate NO,, <br /> and VOC emissions from construction equipment,which may include: <br /> • Require construction equipment used at the site to be equipped with <br /> catalysts/particulate traps to reduce particulate emissions. These catalysts/traps require <br /> the use of ultra-low sulfur diesel fuel(15 ppm). Currently, CARB has verified a limited <br /> number of these devices for installation in several diesel engine families to reduce <br /> particulate emissions. At the time bids are made, contractors must show that the <br /> construction equipment used is equipped with particulate filters and/or catalysts or <br /> prove why it is infeasible. <br /> • Use alternative fueled construction equipment,where feasible. <br /> • Replace fossil-fueled equipment with electrically driven equivalents (provided they are <br /> not run via a portable generator set). <br />