Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.E-14 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • All site personnel who work in permanent structures will be trained to use and respond <br /> to the landfill gas monitoring and alarm system. <br /> This impact is still considered potentially significant;therefore the following additional <br /> mitigation measure is identified: <br /> Mitigation Measure E.4: (Same as the 2013 EIR Mitigation Measure E.4.) Landfill gas <br /> monitoring shall include the volatile organic compounds in order to determine the amount of <br /> contaminant recovery, and control potential exposure to onsite personnel. <br /> Implementation of the proposed procedures and this mitigation measure would reduce the <br /> impact to a less-than-significant level because it allows the County and applicant to control <br /> potential exposure of personnel to hazardous gases. <br /> Impact E.5: Solid waste pathogens could be spread by vectors. (Same as 2013 EIR Impact E.5.) <br /> Refuse in landfills attracts vectors such as rats,moles, gulls, etc. that can carry infectious <br /> pathogens, disease and parasites. More vectors over time would likely be attracted to the <br /> landfill due to its expansion over time. This could increase the likelihood of human exposure to <br /> the pathogens carried by the vectors. <br /> The potential public health and nuisance problem from vectors is a potentially significant <br /> impact. <br /> The following procedures are proposed as part of the project: <br /> • The landfill operator will follow legally required daily or alternative cover practices. <br /> • The landfill will continue to ban intact tires (which collect water and serve as a breeding <br /> ground for vectors)and large dead animals from disposal at the landfill. <br /> • Existing measures to discourage gulls from the landfill will be continued. <br /> • Appropriate landfill personnel will periodically monitor the landfill for the presence of <br /> vectors, and landfill inspections will be documented in the landfill operations <br /> administrative file. <br /> Implementation of these procedures would reduce this impact to a less-than-significant level <br /> and no mitigation is required. <br /> Impact E.6: The project would involve the use of additional regulated or hazardous materials <br /> during the proposed landfill expansion construction and operation. (Same as 2013 EIR <br /> Impact E.6.) <br /> Construction activities during the extended life of the landfill would include earthmoving, <br /> paving,possible dewatering,various new construction including the new drainage and leachate <br /> collection systems, and painting. Solid waste could be generated from land clearing and <br /> demolition of existing structures. Hazardous materials used in construction may include acids, <br />