Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.F-28 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> appropriate upland buffer, are preserved in perpetuity via recordation of a conservation <br /> easement, or similar deed restriction. <br /> The Wetland Mitigation and Monitoring Plan shall include the following details: <br /> • The location(s)of mitigation areas,including the types and extent of each habitat type to be <br /> created. <br /> • Mitigation for loss of existing wetlands shall at a minimum include the creation of <br /> equivalent acreage of wetland habitat present within the channel (as determined by the re- <br /> verified jurisdictional delineation). Mitigation wetlands shall replace the existing functions <br /> and services provided by the impacted channel. <br /> • All graded areas within the habitat restoration area shall be seeded with appropriate mixes <br /> of California native grass and forb species, developed by a qualified restoration ecologist. <br /> • The stated goal of the mitigation effort shall be to establish self-sustaining wetland <br /> vegetation that shall not require long-term irrigation or maintenance. <br /> • The mitigation site shall include the establishment of a vegetated upland buffer no less than <br /> 50 feet wide on both sides of the recreated channel, where practicable. <br /> • Provide grading details, location and quantities of all plant materials to be planted or <br /> seeded,native seed mixes to be used on all bare ground surfaces,monitoring procedures <br /> and schedules, identification of remedial measures, and performance criteria to be used by <br /> the agencies to assess success or failure of the mitigation effort. <br /> • Long-term monitoring over a minimum of five years shall be funded by the Project Sponsor, <br /> subject to approval by the regulatory agencies. <br /> • Annual monitoring reports shall be submitted to each permitting agency. <br /> • A wetland delineation and habitat map shall be prepared during the final year of <br /> monitoring and included in the final annual report. <br /> • Subject to review and modification by the regulatory agencies,specified success standards <br /> shall call for, at a minimum, 80% survival of any plantings and vegetation will be restored to <br /> the extent that it currently occurs as detailed in the most recent wetland delineation report, <br /> at the end of the monitoring period and after at least two consecutive years of no <br /> supplemental irrigation. <br /> Off-Site Wetland Mitigation <br /> In addition to the approximately 1.87 acres of wetlands to be created onsite, if required as a <br /> permit condition, additional mitigation credits may be purchased from a qualified wetland <br /> mitigation bank with a Service Area that covers the project site, or as otherwise approved in <br /> advance by the USACE and RWQCB. For example, the expanded Service Area of the Cosumnes <br /> Floodplain Mitigation Bank covers the project site. This mitigation bank sells Floodplain Mosaic <br /> Wetlands credits (404)credits that would appropriately mitigate impacts to wetlands. This, in <br /> combination of the onsite wetland mitigation, would provide opportunities (if needed)to <br />