Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.F-30 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • Any observed mortalities of species-status species shall be immediately reported to the <br /> USFWS and CDFW. <br /> Mitigation Measure F.2-2. Water shall be released into the restored South Branch of the South <br /> Fork of Littlejohn's Creek gradually to avoid creating a sediment plume downstream that could <br /> attract and cause mortality to Chinook salmon or steelhead from the San Joaquin River to enter <br /> the channel. After the relocation of the channel is completed and is ready to convey water, <br /> initial flows will be released at approximately 2 cubic feet/second (cfs), and shall be monitored <br /> to assure that water is released gradually through the channel for the first week after re- <br /> opening. This reduced flow would avoid causing a sediment plume. The restored channel shall <br /> not be opened prior to or during a significant rainfall event, and initial releases into the channel <br /> shall be coordinated with the Central San Joaquin Water Conservation District to insure no <br /> significant releases are scheduled during the initial opening of the channel. <br /> Implementation of these mitigation measures would reduce salmon/steelhead impacts to a less <br /> than significant level because it would avoid causing a sediment plume. <br /> Impact F.3. Potential"Take"of Giant Garter Snake. Although the study area does not provide <br /> expected habitat for giant garter snake, the species has been recorded in the watershed within <br /> approximately 7 miles of the study area. In addition,portions of the Stockton Diverting Canal, <br /> Littlejohn's Creek, Lone Tree Creek, and French Camp Slough are considered to have habitat <br /> elements for the species (SJCOG 2000). If the species were present in the South Branch of the <br /> South Fork of Littlejohn's Creek during construction, a"take" of giant garter snake could occur. <br /> This is a potentially significant impact. In the long term, restoration of the realigned creek <br /> channel, proposed as part of this project, will provide at least equivalent enhance habitat for <br /> some semi-aquatic and riparian wildlife species,including for giant garter snake. <br /> Mitigation Measure F.3. Participation in the SJMSCP affords the project proponent Incidental <br /> Take authorization for giant garter snake pursuant to ESA, CESA and CEQA. Nonetheless,to <br /> minimize the potential for "incidental take" of giant garter snake,the following measures <br /> required by the SJMSCP (SJCOG 2000)shall be applied: <br /> A)A preconstruction survey for the species shall be conducted according to the requirements of <br /> the SJMSCP by a qualified biologist approved by the SJMSCP Technical Advisory Committee <br /> (TAC). If a giant garter snake is detected within the study area, the project will undertake <br /> Incidental Take Avoidance and Minimization Measures to protect the species as directed by the <br /> TAC. The project shall also comply with any mitigation requirements specified for giant garter <br /> snake habitat by the SJMSCP TAC (SJCOG 2000). Avoidance and minimization measures may <br /> include the following, as specified by the TAC: <br /> 1. Construction shall occur during the active period for the snake,between May 1 and <br /> October 1. Between October 2nd and April 30th,the SJMSCP Joint Powers Authority <br /> (JPA), with the concurrence of the Permitting Agencies' representatives on the TAC, <br /> shall determine if additional measures are necessary to minimize and avoid take. <br /> 2. Limit vegetation clearing within 200 feet of the banks of potential giant garter snake <br /> aquatic habitat to the minimal area necessary. <br />