My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page IV.F-36 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • A setback of 100 feet from loggerhead shrike nest sites shall be established and <br /> maintained during the nesting season(i.e., February 1 to August 15)for the period <br /> encompassing nest building and continuing until fledglings leave nests. This setback <br /> applies whenever construction or other ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that are known to be occupied. Setbacks shall <br /> be marked by brightly colored temporary fencing. <br /> These Incidental Take Minimization Measures are consistent with the provisions of the MBTA. <br /> Northern Harrier and California Horned Lark <br /> Although foraging northern harrier has been observed in the project vicinity and there is a <br /> potential for foraging by California horned lark,nesting by these species on site is considered <br /> unlikely due to the limited extent of grassland habitat. Participation in the SJMSCP affords the <br /> project proponent Incidental Take authorization for northern harrier and California horned lark <br /> pursuant to CESA and CEQA. Nonetheless, as outlined in the SJMSCP64, the following <br /> incidental take avoidance measures shall be followed: <br /> • Prior to the initiation of ground clearing, grubbing, grading or excavation activities, a <br /> scheduled to occur during the breeding season (i.e., February 1 -August 31), <br /> preconstruction survey shall be performed by a qualified biologist. <br /> • A setback of 500 feet from nesting areas shall be established and maintained during the <br /> nesting season for the period encompassing nest building and continuing until <br /> fledglings leave nests. This setback applies whenever construction or other ground- <br /> disturbing activities must begin during the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be marked by brightly colored temporary <br /> fencing. <br /> These Incidental Take Minimization Measures are consistent with the provisions of the MBTA. <br /> Tricolored Blackbird <br /> Suitable nesting habitat for this species does not occur on the project site,but it could nest in the <br /> riparian habitat associated with the North Branch of the South Fork of Littlejohn's creek. <br /> Participation in the SJMSCP affords the project proponent Incidental Take authorization for <br /> tricolored blackbird pursuant to CESA and CEQA. Nonetheless, as outlined in the SJMSCP65, <br /> the following incidental take avoidance measures shall be followed: <br /> • Prior to the initiation of ground clearing, grubbing, grading or excavation activities, a <br /> scheduled to occur during the breeding season (i.e., February 1 -August 31), <br /> preconstruction survey shall be performed by a qualified biologist. <br /> • A setback of 500 feet from nesting areas shall be established and maintained during the <br /> nesting season for the period encompassing nest building and continuing until <br /> fledglings leave nests. This setback applies whenever construction or other ground- <br /> disturbing activities must begin during the nesting season in the presence of nests that <br /> 6a SJMSCP Chapter 5.2.4.17 <br /> 6s SJMSCP Chapter 5.2.4.17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.