Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.G-14 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> vertically on the east by wells AMW-5R,AMW-30S and AMW-30 and partially to the west by <br /> wells AMW-28,AMW-32S,AMW-32, and AMW-2. The north and west side EMPs are being <br /> performed to define the non-detection or zero. The zero line for the vertical and lateral extent of <br /> the plume to the northwest,north, and north-northeast is also under investigation. The overall <br /> shape of the VOC-affected plume with respect to groundwater contours and the distribution of <br /> VOCs between the shallow and deeper zones indicate the lateral and vertical limits of the VOC <br /> affected groundwater have likely been affected by regional flow conditions <br /> (agricultural/industrial pumping, recharge rates,etc.). <br /> In addition to the sampling at the CDCR, groundwater samples were collected from 51 <br /> residences between February 7 and May 18, 2018. Six of the 51 residential wells showed <br /> detected VOCs in the wells as reported by GLA(2018). <br /> Forward is continuing to assess landfill gas and groundwater issues at the Austin Road Unit <br /> and complying with RWQCB requirements for the CAP. The April 2009 installation of two new <br /> groundwater extraction wells at Forward increases the volume of groundwater being extracted <br /> and treated"at the source" and to an extent draws back the groundwater plume migrating <br /> offsite. <br /> Leachate Generation, Treatment, and Monitoring <br /> The northeast and southern WMU expansions proposed in this project would have Class II <br /> lining and leachate collection designs that comply with current requirements. The Forward <br /> Class II Surface Impoundments (i.e, leachate ponds)would be lined with high density <br /> polyethylene (HDPE)geomembrane. Both new areas would have the leachate collection and <br /> monitoring required (by the RWQCB)of the landfill operations, as described in the project <br /> description of the expansion. The new units would have blanket LCRS. The components of the <br /> LCRSs are summarized in the Project Description. The blanket LCRS described would be placed <br /> on both the base and slopes of the landfill expansion modules. The LCRS is the first line of <br /> defense for the protection of groundwater from any leachate generated from the landfill. <br /> There are currently two Class II surface impoundments at the Forward Landfill: WMU F-West <br /> and WMU F-North. An additional Class II impoundment,WMU F-South, is permitted but has <br /> not yet been constructed. A Compost Pond is located in the southern portion of the site <br /> (southern expansion area). Both Class II impoundments have 1:1 (horizontal:vertical)slopes, <br /> contain a sump with a side slope riser and a double liner system consisting of, from top to <br /> bottom: <br /> • 60-mil HDPE primary geomembrane <br /> • Geonet <br /> • 60-mil HDPE secondary geomembrane. <br />