Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.G-23 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> The impact from the loss of direct infiltration over the expansion area is considered to be less <br /> than significant. <br /> Mitigation Measure G.7:None required. <br /> Impact G.8. Increased sedimentation during the construction phase of the relocation of the <br /> South Branch of South Littlejohns Creek. <br /> Construction and operation of the relocated South Branch of South Littlejohns Creek channel <br /> could result in additional sedimentation and surface water quality impact during the <br /> construction phase and shortly thereafter if appropriate BMPs to minimize such impact are not <br /> adhered to. Constructing the Creek alignment during the dry season would be minimize any <br /> sedimentation and water quality impact. <br /> Mitigation Measure G.8: Implement the proposed Questa Engineering design specifications <br /> and standard construction BMPs during the construction phase of the South Branch of Sough <br /> Littlejohns Creek realignment. Construction of the realigned creek channel shall be <br /> implemented during the dry season. <br /> The proposed mitigation would reduce potential impact of sedimentation from the proposed <br /> creek alignment to a less-than-significant level. <br />