Laserfiche WebLink
April 4, 2012 <br /> implementation of the seismic design measures designed to meet CCR <br /> Title 27. <br /> Current Status: Forward designs all waste management units at the site to <br /> comply with the seismic design measures included in the CCR Title 27 <br /> requirements. <br /> 11. U.S. ARMY CORPS OF ENGINEERS (Sacramento Office, 916-557-5100) <br /> a. 63 Austin 1994 (F1.a, F1.b, and F1.c) (similar but updated), Austin <br /> 2000(F1.a) <br /> (Creek realignment) Monitoring and maintenance for five years following <br /> construction. <br /> Current Status: Forward realigned the creek in 2002. Questa Engineering <br /> prepared a final monitoring report in August 2007 titled 2007 Project <br /> Conditions, Creek Realignment and Habitat Restoration; North Branch of <br /> South Fork of Littlejohn's Creek at Forward Landfill. <br /> b. 64 Austin 2000(F1.c) <br /> Restoration of the riparian area shall include revegetation with trees, <br /> shrubs, and grasses native to the area. Plantings shall have a minimum <br /> 80% survival after the first year, and 100 % survival thereafter, or shall <br /> have attained a 75% cover after three years and a 90% cover after five <br /> years. Plantings shall be monitored each year and maintained as <br /> necessary until success criteria have been met. In order to assure <br /> implementation, the Wetlands Mitigation and Monitoring Plan shall be <br /> modified to include these criteria. <br /> Current Status: Forward restored the riparian are in 2002. Questa <br /> Engineering prepared a final monitoring report in August 2007 titled 2007 <br /> Project Conditions, Creek Realignment and Habitat Restoration;North Branch <br /> of South Fork of Littlejohn's Creek at Forward Landfill. <br /> 12. CALIFORNIA DEPARTMENT OF FISH AND GAME (Staff Contact: Kelly <br /> Price, 916-358-2879) <br /> a. 63 Austin 1994 (F1.a, F1.b, and F1.c) (similar but updated), Austin <br /> 2000(F1.a) <br /> (Creek realignment) Monitoring and maintenance for five years following <br /> construction. <br /> Current Status: Forward restored the riparian are in 2002. Questa <br /> Engineering prepared a final monitoring report in August 2007 titled 2007 <br /> Page 43 <br />