Laserfiche WebLink
April 4, 2012 <br /> Proposed as Part of the Project: <br /> If leachate is delivered to the City of Stockton Regional Wastewater <br /> Control Facility, the project sponsor will provide for independently <br /> corroborated test results to the City to demonstrate the chemical <br /> composition of the leachate extracted from the proposed consolidated <br /> landfill project. Monitoring and testing of landfill-generated leachate will <br /> meet the requirements of the City of Stockton Wastewater Ordinance and <br /> the City Municipal Utilities Department. <br /> If leachate quality is not acceptable for disposal at the Regional <br /> Wastewater Control Facility, the project sponsor will either have the <br /> leachate collected and disposed off-site by a licensed Treatment and <br /> Disposal Facility, or will develop on-site leachate processing that will result <br /> in treated leachate that is acceptable for disposal at the wastewater <br /> treatment plant or acceptable to regulatory agencies for on-site use. The <br /> design and operation of any on-site leachate processing that is <br /> implemented will comply with all applicable laws and regulations. <br /> Current Status: Leachate is currently retained onsite in the leachate <br /> evaporation ponds. <br /> Page 47 <br />