Laserfiche WebLink
It is imperative that the toilet and sink are checked periodically, at least once per month for leaking <br /> fixtures. <br /> As-Builts of the septic system must be drawn and submitted to the EHD by the septic system <br /> installer/contractor after installation. <br /> It is important to recognize that all septic systems and disposal areas have a lifespan. This lifespan <br /> is unpredictable due to the numerous operational and environmental factors involved. Biomat <br /> buildup that will occur at the soil/effluent interface within the leachline and seepage pit is a <br /> naturally occurring process. Since the effluent flow volumes will be small and the organic loading <br /> comparatively light,the biomat formation process should take a long period of time. <br /> IV. LIMITATIONS <br /> The findings, opinions, conclusions and design criteria expressed in this report are based upon <br /> information from standard engineering data and analytical procedures, contemporary scientific <br /> literature, field observations and agency consultations. Information in this report is deemed reliable <br /> by the sources from where it was obtained. <br /> This report is based upon current scientific knowledge to assess factors which are extremely <br /> variable and complex within the environment. Although there are several methods to design, size <br /> and predict impact from septic systems, San Joaquin County Environmental Health Division <br /> Sewage Standards, federal and state publications and information from the scientific literature have <br /> been employed for these purposes, and for this project. Therefore, no guarantee or warranty <br /> concerning any aspect of this investigation or design criteria is expressed or implied. <br /> The opportunity to provide this service for you is appreciated. If there should be any questions <br /> regarding the information contained in this report, please contact the undersigned. <br /> Respectfully submitted, <br /> Q,ofesslo <br /> CHESNEY CONSULTING �o�D. Che�oa <br /> 5 4 <br /> u No.7Sd79 <br /> a „ <br /> Don Chsney, PE s + <br /> Registered Civil Engineer#C75479 �d�e C1°il c�9 <br /> Of Capt° <br /> Page -5- <br />