Laserfiche WebLink
(2) If Fire Protection Systems are required they shall be installed according to the CFC, Chapter <br /> 9 and the appropriate standards and guides adopted in Chapter 35 of the California Building <br /> Code and the California Electrical Code. <br /> (3) CFC, Section 503 Fire Apparatus Access Roads — Shall be provided as required by this <br /> section. <br /> (4) CFC, Section 906 Portable Fire Extinguishers — Provide portable fire extinguishers as <br /> required by this section. <br /> (5) CFC, Section 506 Key Box — A Knox® Box shall be installed according to the local fire <br /> department's instructions. Make application for the key box at the fire district having <br /> jurisdiction of this project. If there is an electronically controlled access gate at this site a <br /> Knox®key switch will also be required. <br /> (6) CFC, Section 5001.3.3.1 Properties of Hazardous Materials — A complete list of hazardous <br /> materials used and or stored at this site shall be provided. <br /> (7) A complete review, at building permit submittal, will require compliance with applicable codes <br /> and ordinances. <br /> (8) CFC, Section 105 Permits: Operational permit(s) may be required prior to occupancy. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Alex Chetley, [209]468-3000) <br /> a. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link fence <br /> or equal when the maximum design depth is 18 inches or more. Required retention basin <br /> capacity shall be calculated and submitted along with a drainage plan for review and approval, <br /> prior to release of building permit. (Development Title Section 9-1135) <br /> b. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule <br /> at the time of payment. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00-433) <br /> c. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule <br /> at the time of payment. (Resolution R-06-38) <br /> d. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R94-185 and R-97-5) <br /> e. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> f. This project falls within the definition of a Priority Project as defined in either the County "Storm <br /> Water Quality Control Criteria Plan" (SWQCCP) or the County Phase I National Pollutant <br /> Discharge Elimination System (NPDES) permit and shall comply with the following conditions: <br /> (1) A registered professional engineer shall design a system or combination of systems to treat, <br /> filter, or infiltrate the 85th percentile storm as defined in the County's 2009 SWQCCP. The <br /> San Joaquin County PA-1800106/Progressive Community Church <br /> Community Development Page 12 <br />