Laserfiche WebLink
1. CFC 507 Fire Protection Water Supply — Fire flow and hydrants shall be provided for the <br /> proposed project by the use of: CFC Appendix B. <br /> 2. If Fire Protection Systems are required they shall be installed according to the CFC, Chapter 9 <br /> and the appropriate standards and guides adopted in Chapter 35 of the California Building <br /> Code and the California Electrical Code. <br /> 3. CFC, Section 503 Fire Apparatus Access Roads—Shall be provided as required by this section. <br /> 4. CFC, Section 906 Portable Fire Extinguishers—Provide portable fire extinguishers as required <br /> by this section. <br /> 5. CFC, Section 506 Key Box — A Knox@ Box shall be installed according to the local fire <br /> department's instructions. Make application for the key box at the fire district having jurisdiction <br /> of this project. If there is an electronically controlled access gate at this site a Knox®key switch <br /> will also be required. <br /> 6. CFC, Section 5001.3.3.1 Properties of Hazardous Materials — A complete list of hazardous <br /> materials used and or stored at this site shall be provided. <br /> 7. A complete review, at building permit submittal, will require compliance with applicable codes <br /> and ordinances. <br /> 8. CFC, Section 105 Permits: Operational permit(s) may be required prior to occupancy. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209] 468-3000) <br /> a. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval, prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> b. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee will be based on the current schedule at the time <br /> of payment. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> c. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> d. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R94-185 and R-97-5) <br /> e. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> f. This project falls within the definition of a Priority Project as defined in either the County "Storm <br /> Water Quality Control Criteria Plan"(SWQCCP)or the County Phase I National Pollutant Discharge <br /> Elimination System (NPDES) permit and shall comply with the following conditions: <br /> 1. A registered professional engineer shall design a system or combination of systems to treat, <br /> filter, or infiltrate the 85th percentile storm as defined in the County's 2009 SWQCCP. The <br /> system design shall follow standards as outlined in the 2009 SWQCCP or in the "California <br /> PA-1800106 — Revised Conditions of Approval 5 <br />