Laserfiche WebLink
r <br /> ROM S J C O G, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 a (209)735-0600 • FAX(209)235-0438 <br /> San Joaquin County Multi-Species HaMtat Conservation&Open Space Plan(SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Rick Griffin,San Joaquin County,Community Development Department <br /> From: Laurel Boyd,SJCOG, Inc. <br /> Date: September 29,2016 <br /> Local Jurisdiction Project Title: PA-1600202(SA) <br /> Assessor Parcel Number(s): 212-110-08,212-120-02,-03,-08,-09,-14 <br /> Local Jurisdiction Project Number: PA-1600202(SA) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Agricultural and Natural Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Mr. Griffin: <br /> SJCOG, Inc. has reviewed the application referral for PA-1600202 (SA). This project consists of a Site Approval <br /> application for the expansion of an existing dairy to include the construction of a 12,500 square foot milk barn, a 40,000 <br /> square foot free stall barn, two 60,000 square foot free stall barns, one 38,400 square foot loafing (shade) barn, one <br /> 10,200 square foot loafing barn, one 8,500 square foot loafing barn, and one 12,000 square foot commodity barn. The <br /> project site is located on the east side of Bacchetti Road, 350 feet north of Whitehall Road, Tracy (APN/Address: 212- <br /> 110-08, 212-120-02, -03, -08, -09, -14; 18344 S Bacchetti Road, Tracy). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This project is subject to the SJMSCP and is located within the unmapped land use area. Per requirements of the <br /> SJMSCP, unmapped projects are subject to case-by-case review. This can be a 90 day process and it is recommended <br /> that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br /> obtain an information package. http://www.sicog.org <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and most be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITNUM or issuance of a building permit,whichever occurs first the project applicant must: <br />