Laserfiche WebLink
!'!"!. c �OUNTY OF SAN JOAC4N THOMAS R. FLINN <br /> �: •,yt DEPUTY DIRECTOR <br /> m'• DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810- 1810 E. HAZELTON AVENUE STEVEN WINKLER <br /> FORSTOCKTON, CALIFORNIA 95201(209) 468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX (209) 468-2999 <br /> DIRECTOR <br /> June 27, 2000 RECEIVEE) <br /> MEMQRANDUM JUN 2 $ 2000 <br /> TO: Kerry Sullivan, Deputy Director Community Development Dept. <br /> Community Development Department <br /> CONTACT PERSON: Jennifer Jolly <br /> FROM: Ben E.Neely, Engineer II 'F,9=tj <br /> Public Services Division <br /> SUBJECT: LA-00-46 A LOT LINE ADJUSTMENT APPLICATION TO ADJUST LOT <br /> LINES BETWEEN TWO PARCELS TO PROVIDE A LARGER SIDE <br /> YARD FOR THE EXISTING RESIDENCE ON PARCEL TWO. PARCEL <br /> ONE TO CONTAIN 15,834 SQUARE FEET AND PARCEL TWO TO <br /> CONTAIN 13,234 SQUARE FEET, LOCATED ON THE NORTH SIDE OF <br /> BACON STREET, 40 FEET EAST OF MCCOMB AVENUE. <br /> (DISTRICT 2). <br /> APPLICANT: Harry and Ella Brandt APN: 119-190-67 and 68 <br /> INFORMATION: <br /> Bacon Street has an existing right-of-way width of 40 feet and a planned right-of-way width <br /> of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. A Recorded Deed is allowed,but if points or lines are set, a Record of Survey is required. <br /> (New legal description shall be submitted to Surveyor's office for review.) <br /> (Development Title Section 9-872.4) <br /> 2. New description must reflect correct distance with qualifiers to avoid overlap or gap. <br /> 3. This development is subject to reapportionment under the San Joaquin Area Flood <br /> control Agency Assessment District No. 96-1 (Flood Protection Restoration Project). An <br /> application requesting the reapportionment of the unpaid portion of the assessment, along <br /> with the payment of the reapportionment fee, shall be provided prior to recording the <br /> Notice of Lot Line Adjustment. <br /> 4. This development is subject to assessments under Improvement District No. 51 <br /> (originally APN 119-190-01). The subdivider shall initiate processing of Segregation of <br /> Services. Currently, the fee for processing the segregation is $250 plus $15 per lot, per <br /> Development Title Section 9-240.2 and Resolution R-91-327. <br /> (Development Title Section 9-1105.3) <br /> BN:mr <br /> PS-OF133-M6 <br /> E: Tom Gau, Deputy Director/Development <br />