My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0056541
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BACON ISLAND
>
17247
>
2600 - Land Use Program
>
SR0056541
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 1:14:37 PM
Creation date
9/4/2019 10:11:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SR0056541
PE
2602
FACILITY_NAME
BULL FROG MARINA
STREET_NUMBER
17247
STREET_NAME
BACON ISLAND
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
12917013
ENTERED_DATE
2/17/2009 12:00:00 AM
SITE_LOCATION
17247 BACON ISLAND RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BACON ISLAND\17247\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> 3-6 EXTENSION PIPE <br /> 3-6-1 For installations where the macerating tank is hidden behind a wall, an extension pipe kit K001184 will be needed <br /> (sold separately). The extension pipe is 16"long.One end slips inside the macerator connector and is secured with a <br /> hose clamp. The other end utilizes the same accordion style grommet to connect to the toilet discharge hub. Two <br /> hose clamps are needed at the toilet end to secure the connection. The toilet should be raised by at least 318" to <br /> facilitate proper gravity flow toward the macerator box. See schematic below. <br /> WALL <br /> 1 INCH MINIMUM <br /> 11B"PER FOOT SLOPE <br /> RECOMMENDED <br /> OPTIONAL AVAILABLE <br /> EXTENSION PIPE KIT. <br /> KIT NUMBER K001184 <br /> 3-7 CONNECTION TO A VENT SYSTEM <br /> 3-7-1 The product must be vented. The macerating pump has a hub on the lid (1-112 inch in diameter).All plumbing codes <br /> require that the case be vented. Connect 1-112"pipe to the adapter installed in section 3-1-3. <br /> I - Do not use an air admittance valve or a mechanical spring-loaded venting device,as these devices are one- <br /> way valves. The air pressure in and outside the macerating pump unit must be equal, a "cheater' vent will <br /> obstruct the airflow one direction. <br /> 3-8 INSTALLATION TIPS <br /> 3-8-1 PIPE SUPPORTS <br /> All sanitary pipe work must be supported in accordance with the pipe manufacturer's recommendations.Avoid <br /> dipping or trapping,which may cause the build up of residual"solids"and subsequent blockage. <br /> 3-8-2 SENDS <br /> Wherever possible, long sweeping bends should be used. Do not use short elbows. If a sweeping 90°elbows are not <br /> available, use two 45°elbows to make a 90°turn. <br /> 3-8-3 VERTICAL INSTALLATION FIRST <br /> If vertical lift is required,this must precede the horizontal pipe run. <br /> 3-8-4 DIRECTLY VERTICAL <br /> All vertical lifts should rise as directly above the unit as possible, allowing only for the need to clear the toilet tank. <br /> Any initial horizontal pipe run from the unit, prior to a vertical lift should not exceed 12". <br /> a <br /> OCopyright 2008 Liberty Pumps Inc. All rights reserved. 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.