Laserfiche WebLink
A&J Solari Inc. Property SSCR Page 7 of 10 <br /> Our Project Number: LES090508 <br /> January 29, 2009 <br /> II. STRUCTURES <br /> Are there currently any structures on the property? ©Yes <br /> ❑ No <br /> To the best of your knowledge, have there been any structures on the ❑ Yes LNo <br /> property in the past which have since been removed? <br /> If the answer to either of those question is"yes," please answer the following: <br /> 1. For each existing building, please provide type of building and date of original <br /> construction and any substantial renovations: <br /> �T nu C U V K-n!,t 11 u v O t/vi "VUch' 'i -- <br /> I <br /> 2. For each building known to have been removed, please provide type of building and <br /> approximate dates the building existed: <br /> 01N_ <br /> 3. How are the structures heated and cooled (e.g., central, wall-mounted unit, space <br /> heaters, etc.), and what powers the heating and cooling devices (e.g., electric, <br /> propane, fuel oil tank, fireplace, etc.)? NOM Wi✓YiiM - Vep,,(ttu-- <br /> on,. (,� ef(� b � C�ecb�mt 2� V Imo_ <br /> 4. Provide a brief description of existing development with property dimensions, area, <br /> and acreage. <br /> f V✓ , 4Vii, hi- ('� ct �.Oyt Va.,, LAtt i OV ,}vim S <br /> 5. Are there any currently, or the best of your knowledge have ❑ Yes ©-140 <br /> there been previously, any flooring, drains, or walls located <br /> within the facility that are stained by substances other than <br /> water or are emitting foul odors? <br /> 6. If any buildings were constructed prior to 1980, is there any ❑ Yes ❑ No <br /> currently or was there previously asbestos in any of the <br /> construction materials contained in the building(s)? 0 /- <br /> If so, has a survey been conducted to assess the type, amount, ❑ Yes ❑ No <br /> location and condition of asbestos? (Please attach a copy of any <br /> survey report.) <br /> 7. If any buildings were constructed prior to 1980, is there any ❑ Yes ❑ No <br /> currently or was there previously lead-based paint applied to the <br /> building(s)? N 1- <br /> If so, has a survey been conducted to assess the type, amount, ❑ Yes ❑ No <br /> location and condition of lead-based paint? (Please attach a <br /> copy of any survey report.) <br /> ",44 <br /> ©2008 Neil O.Anderson Et Associates, <br /> 902 Industrial Way- Lodi, CA 95240-209.367.3701 - Fax 209.369.4228 Inc. <br />