Laserfiche WebLink
10:00 a.m. 2 USE PERMIT APPLICATION NO. PA-020024&OF FLAG <br /> CM CITY. L.P. (CIO QPM,LLC). A Use Permit Application for a <br /> full service travel center(Use Type: Truck Stop) to include (1) <br /> gasoline and diesel sales (7832 sq. ft.), (2) truck repair and <br /> maintenance services (8022 sq. ft.), (3) food services (3513 sq. ft.), <br /> (4) convenience/retail stores (2485 sq. ft.), (5) 24-hour parking, (6) <br /> ancillary services: shower, laundry,telecommunications, <br /> entertainment (2055 sq. ft.). (7)truck scale (1085 sq. ft.), and (8) <br /> sign plan. Located at the southeast quadrant of Interstate 5 and , <br /> State Route 12,west of Lodi, (APN: 055-320-50; Address: 6301 <br /> V. Banner Street,Lodi). <br /> Jim Van Buren, Senior Planner; Ron Stupi, QPM; Ceil Dillon, Dillon& Murphy, and <br /> Jose Alva resent for this item. <br /> were p <br /> Mr.Van Buren asked the applicants if they would be submitting a sign plan by Friday 20, <br /> 2002. Mr. Stupi indicated yes. <br /> Mr. Stupi indicated that the only access gate will be coming off of Banner Street, and that <br /> will be the emergency access. <br /> Mr. Karam asked that emergency access gates be excluded from the minimum of sixty <br /> five (65) feet from property line. <br /> Mr. Stupi asked if the landscaping would be included in the truck parking area. Mr. Van <br /> Buren reviewed the landscaping requirements and assured the applicants that trucks are <br /> not part of the landscaping areas. <br /> Woodbridge irrigation District submitted ens n indicated that he ould send QPM a <br /> contacted Mr. Christensen of WIconcerns to QPM. Mr- StuP' <br /> D M <br /> letter listing the conditions of approval, which Mr. Stupi indicated they would comply <br /> with. <br /> Mr_ Van Buren asked if there has been a traffic study per Caltrans letter. Mr. Karam <br /> indicated he is handling the matter with Caltrans. <br /> Mr. Karam indicated that the sewer capacity was adequate for the project, and signed it <br /> off of the Public Works Departments conditions. <br /> 10:30 a.m. 3. SITE APPROVAL JEpSEN WEBB RANCH (C p PLICATION NO. SA-01-21 (TIME <br /> CM EXTENTION) O <br /> WELLHEAD POWER,LLC). A one-year Time Extension for a <br /> Site Approval appfacility. <br /> oaed on thelation of a gas west side of Lammers Road, <br /> ne based <br /> generating facility. <br /> 2700 feet south of Schulte Road, Tracy (APN: 209-240-11; <br /> Address: 26977 S. Lammers Road, Tracy). <br /> The applicants did not appear for this item. <br />