Laserfiche WebLink
fr.J a� <br /> Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-02-244 <br /> RECOMMENDATIONS: <br /> 1. The Applicant or the property owners of Flag City shall pay$80,000 for fair share <br /> contribution to signal on State Route 12 prior to issuance of any building permits. <br /> 2. An encroachment permit shall be required for work within road right-of-way. ' <br /> (Development Title Sections 9-1145.4 and 9-1145.5) f <br /> i <br /> 3. The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Standards CW-C11 or CW-C 12 prior to issuance of the occupancy <br /> permit. <br /> (Development Title Section 9-1145.5) <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $ 170.16 per <br /> daily trip-end generated in the Lodi area. The fee shall be automatically adjusted July 1 of M <br /> each year by the Engineering Construction Cost Index as published by the Engineering <br /> News Record. A credit may be allowed if it can be verified that the existing development <br /> on this site was in operation on or after April 23, 1990.) <br /> (Resolutions R-00-433) y <br /> 5- <br /> Pa <br /> Tile fe.- F"J able prior to issuance of the building pernfit,--(T+e 4 <br /> 11-09 gioss square fbot of building designated as Serviceeonmir.ciat. Tiie <br /> &e shali b 11,-inct eased on J=ary 1 of each y ear tit Ie-I Fear:100 5 at <br /> rate TC Wnt. A credit may be aflowed ifi cm. be v m.'�%A LAA:"-L' 41-%�w 'VY-Al <br /> E), <br /> f 9917) <br /> - - , R-94-HS - I <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> I <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this <br /> development has'mbfthe requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> 7. Applicant shall obtain a Storm Water Pollution Prevention Plan (SWPPP) permit from the <br /> State Water Resources Control Board prior to the beginning of any construction. <br /> S. A Traffic Study is required due to the potential traffic that will be generated by the <br /> proposed development. The Traffic Study shall analyze traffic impact to State Route 12 L <br /> and circulation in the area in the absence of Banner Street. In addition, the Traffic Study <br /> shall analyze the adequacy of the location of the north entrance's proximity to State Route <br /> 12. The Traffic Study shall be completed prior to approval of this application. The <br /> developer shall deposit funds with the County for all costs as estimated by the Department <br /> of Public Works, Public Facilities Division. Any mitigation required by the Traffic Study i <br /> shall be required prior to finial occupancy. (The abandonment of a portion of Banner <br /> Street is dependent on the results of the traffic study and at the discretion of the County.) <br /> i <br /> 9. The structural section of Star Street shall be analyzed for the Traffic Index for a Truck <br /> Stop. Any required improvements shall be completed prior to occupancy. <br /> i <br />