Laserfiche WebLink
March 17, 2005 _ <: <br /> NOA Project Number.: E05008A - <br /> bottom of the.open soil boring;then the PVC pipe was installed on top-of the gravel. Several feet <br /> of."pea gravel" were backfilled in the annular space. <br /> Presatutation of the percolation test holes on Parcels 5 and 6 occurred on March 1, 2005, <br /> presaturation of the percolation test holes oriaxce1 4,and 7 occurred on March_ 2,_2005 and <br /> Tresaturation of thepercolation.test holes odParcels 1 and 2 occurred n March 3 2005. The depth , <br /> of water used to pre-soak was 12 inches above the bottom oe b oring: <br /> 6.4 Condition of Borings After Presaturation <br /> F1 =4 <br /> After the 24-hour soak.period, the presaturated holes were found to be intact and-dry on the day of <br /> C6.5 Percolation Test Procedure <br /> Percolation tests for Parcels 5 and 6 were conducted for,the borings on March 2, 2005 in accordance <br /> with the requirements of the EHD. .A percolation test with a duration of four hours was performed <br /> for each hole..The final half-hour of each four-Hour percolation test was-observed.by.Mr. Mike <br /> Escotto, Registered Environmental Health Inspector, EHD. Percolation tests for Parcels 3, 4"and 7,- <br /> were conducted for the borings on March 3, 2005 in accordance with the requirements.of the EHD. <br /> A percolation test with"a duration of four hours was performed for each hole. The-final half-hour;.. <br /> of each four-hour-percolation"test-was observed liy Mr. Mike Escotto, Registered Environmental <br /> - - <br /> Health-Inspector, EHD:. ;Percolation tesis.for Parcels-1 and 2 were conducted for-the boriui-s on_ <br /> March.4, 2005 in accordance with the requirements of tli ., :'�A-percolation test with-a duration <br /> of ro,77ours was performe or eac o e: .The final half-hour of each four-hour percolation test' <br /> was observed by Mr. Mike Escotto;'Registere.d.Environrnental Health°Inspector, EHD. <br /> Measurement of the water level during the percolation ercolation test was from:a fixed reference point on-the <br /> .; _ <br /> _ - PVC casing using an electricwell sounder with an depth accuracy of.,1/100th foot. All tabulated <br /> values on the field data sheet(appendix) are in decimal feet: After water drop was observed;the <br /> holes were checked for refill. The refill level was approximately 0.5 ft (6 inches) of water above the <br /> ..bottom level of the percolation test hole:=Tlie-r- dings-were taken approximately every 30 minutes . <br /> for a period of four hours. - <br /> " ' 6.6 Percolation Test Forms and Results <br /> The completed percolation test forms-are included ix the appendix of this report. - <br /> A shallow percolation test is defined byahe EHD as being between 36 and 42 inches in depth;a <br /> satisfactory percolation rate for a shallow test is less than or equal to 60 minutes per inch drop. <br /> Details of the percolation tests are summarized in Table 11. <br />