Laserfiche WebLink
S = Sufficient <br /> = Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ® ❑ 6.1 Site map showing the location,with concise and accurate dimensions of the percolation test holes on the parcel. <br /> 5 <br /> F-1 6.2 <br /> o <br /> 6.2 Theimul'n irnber of shallow and deep percolation tests was performed for each parcel. <br /> ® ❑ 6.3 Descr�ion of the date, time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of hole, and depth of water used to presoak(minimum 12 inches). <br /> ❑ 6.4 Descri S <br /> p�dn of the date,time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to water remaining in hole, etc.) <br /> m 1:16.5 The test conformed to Sk)3ollcy EHD 02-02 (correct depth, diameter, 2" gravel, 6"water refill, correct readings <br /> recorded). S <br /> ❑ 6.6 Complete Percolation Test Form (including readings)was provided with REHS verification signature. The rate <br /> was correctly calculated using the last reading. f�Cr -tom <br /> E] ❑ 6.7 Discus//siiort of any potential problems predicted and/or the need for an engineered or alternative septic system. <br /> ❑ 6.8 Discuig(on of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> r/ 6 y 7 <br /> 7.0 CONCLUSION SECTION <br /> ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> _ c <br /> Reviewed By: �Date: <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />