My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7474
>
3500 - Local Oversight Program
>
PR0544800
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
9/4/2019 10:18:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544800
PE
3528
FACILITY_ID
FA0010235
FACILITY_NAME
AMERICAN TRUCK & TRAILER BODY CO
STREET_NUMBER
7474
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25020001
CURRENT_STATUS
02
SITE_LOCATION
7474 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> - Geo4ica(Tecknics Inc. Page 3 <br /> C&B Equipment <br /> Work Plan <br /> fi Project No.336.2 <br /> L December 22, 1999 <br /> The following work will be performed: <br /> • The well casings will be grouted with neat cement slurry installed by pumping grout <br /> under pressure (for estimated grout volumes see Table 1) and allowed to mushroom over <br /> the top of the casing. <br /> • The monitoring well's traffic rated well box will be removed and the well boring will be <br /> drilled out to four (4) feet. Reference the schematic drawing in Figure 2 of well <br /> t t destruction. <br /> Lj • The excavation will be backfilled with clean fill material and capped with concrete <br /> finished flush to surface grade. <br /> r' This work will be scheduled in conjunction with the closure of the domestic well. <br /> 6.� I <br /> 1.4 New Domestic Well Installation <br /> Prior to the closure of the old domestic well, a new domestic well will be installed and <br /> connected to the piping system for the shop and restroom. The well driller in evaluation of <br /> the water production capacity of the formation and water quality test results will determine r <br /> the depth and construction of the well. <br /> Bids will be obtained from at least two well drilling firms and these costs will be included in <br /> rthe Cost Pre-Approval package prepared for the USTCFP. <br /> I <br /> 2.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning field work in late January or early February <br /> 2000 following work plan approval, cost pre-approval from the USTCFP, and coordination <br /> C of schedules. Dr. Ray Kablanow, a registered professional geologist responsible for the <br /> Er work, will supervise the project. Copies of the report will be forwarded to both the <br /> appropriate County and State regulatory agencies. <br /> L. <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.