Laserfiche WebLink
§eol kdTedrzics 4nc. <br /> C&E Equipment Page 4 <br /> Revised Work Plan <br /> Project No.336.2 <br /> March 15,2000 <br /> project. Copies of the report will be forwarded to both <br /> regulatory agencies. the appropriate County and State <br /> 3.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> n� <br /> Jo an R. Pearson <br /> Geol6gical Technician <br /> Michael J. Nierm <br /> Geologist <br /> 10 <br /> A.KA81AA13 <br /> W !!^^ 4 ti <br /> Raynold 1. Kablanow II, Ph.D. s S'31. <br /> California Registered Geologist 95234 ♦���UUtAQc� <br /> Certified Hydrogeologist 9442 <br />