My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7474
>
3500 - Local Oversight Program
>
PR0544800
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
9/4/2019 10:18:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544800
PE
3528
FACILITY_ID
FA0010235
FACILITY_NAME
AMERICAN TRUCK & TRAILER BODY CO
STREET_NUMBER
7474
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25020001
CURRENT_STATUS
02
SITE_LOCATION
7474 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Technics Inc. Page 5 <br /> C&B Equipment <br /> Monitoring Well Installation Work Plan <br /> Project No.336.2 <br /> June 15,1995 <br /> 2.5 Groundwater Monitoring <br /> The wells will be placed on a quarterly groundwater monitoring schedule. The first <br /> monitoring event will be performed shortly after this new well is installed. The local <br /> regulatory agency will be notified 48 hours prior to the sampling event. <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning field work no later than 45 days after <br /> work plan approval and issuance of the monitoring well permit. The information <br /> gathered during this phase of work (monitoring well installation and two quarters of <br /> groundwater sampling) will be presented in a report which will include a summary <br /> of the geology and the results of sample analyses. The project will be supervised by <br /> Dr. Ray Kablanow, a registered professional geologist responsible for the work. <br /> Copies of the report will be forwarded to both the appropriate County and State <br /> regulatory agencies. <br /> i <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with <br /> accepted geologic and hydrologic standards of the State of California accepted and <br /> in effect at the time of this investigation. Geological Technics Inc. is not responsible <br /> for undisclosed conditions. <br /> This work plan was prepared by: <br /> Timothy J(-McDonald <br /> j �oFEssloc <br /> Geologist <br /> ti4r R.L.KA8IANOW 11 r� <br /> � N <br /> NO.5234 ~ <br /> Raynold L Kablanow II, Ph.D. SrR ���P <br /> California Registered Geologist#5234 OF CgLkiu <br /> Registered Environmental Assessor#901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.