My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7474
>
3500 - Local Oversight Program
>
PR0544800
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
9/4/2019 10:18:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544800
PE
3528
FACILITY_ID
FA0010235
FACILITY_NAME
AMERICAN TRUCK & TRAILER BODY CO
STREET_NUMBER
7474
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25020001
CURRENT_STATUS
02
SITE_LOCATION
7474 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&B Equipment Page 4 <br /> Monitoring Well Installation Work Plan <br /> Appendix A <br /> Project No.336.2 <br /> June 15, 1995 <br /> A chain of custody document is filled out which listed all samples collected,their date of collection, <br /> transfers of custody, and laboratory analyses requested. This document is used to track the samples <br /> and to ensure their integrity. <br /> Groundwater physical parameters including temperature, conductivity (EC), and pH are measured <br /> and recorded in the field and are provided in report as field logs. <br /> The groundwater samples may be analyzed by Sherwood Laboratories of Hilmar, California and <br /> tested for benzene, toluene, ethylbenzene, and total xylenes (BTEX) by EPA method 602 and total <br /> petroleum hydrocarbons as diesel(TPH-Diesel)by EPA method 3510/8015rr <br /> The detection limits for these analyses are as follows:benzene,toluene,ethylbenzene,total xylenes 0.3 <br /> µg/l,and TPH-Diesel 50µg/l. <br /> 2.8 Soil Boring Installation <br /> The soil borings will be drilled using a continuous flight hollow stem auger to a total depth to be <br /> determined but not to intercept the groundwater. Soil cuttings will either be containerized in DOT <br /> approved 55 gallon drums,labeled or lain on and covered by plastic sheeting,and stored on site until <br /> their proper disposition can be arranged. Soil samples will be collected for geological and analytical <br /> evaluation at five foot intervals. Soil samples will be collected in 6.0 inch brass liners using a 2.0 inch <br /> modified California split spoon sampler. All soil samples will be sealed with aluminum foil,capped, <br /> labeled and placed in a cooler at 4°Celsius for transport to the laboratory following Chain of Custody <br /> protocol. <br /> Because every soil sample collected will not be submitted for laboratory analysis,a screening process <br /> will be used to gather additional information through field observation noting sediment type, <br /> especially grain size and clay content;moisture content; visible evidence of contamination,i.e.,color <br /> change due to reduction of iron or discoloration from hydrocarbons and other pollutants, and the <br /> readings above background on a organic vapor meter (OVM). The OVM is a field portable photo <br /> ionization detector that uses a 10.0 eV lamp to detect compounds with ionization potential below 10.0 <br /> eV(hydrocarbon range). <br /> The soil borings will be closed as follows:A tremie pipe of sufficient length to reach the total depth of <br /> the boring will be installed through the center of the hollow stem augers and then the augers will be <br /> withdrawn from the hole. The borehole annulus will be closed by pumping a neat cement grout <br /> (<4%bentonite/cement) through the tremie tube up to grade. <br /> 2.9 Monitoring Well Construction <br /> The monitoring wells will be constructed with 2.0/4.0 inch diameter, schedule 40 PVC casing with <br /> flush threaded joints. A screened interval will consist of 0.020 inch perforations extending from <br /> approximately 10 feet below and 5 feet above the water table. <br /> A number three sand will be used to form a filter pack about the saturated zone(0.020")perforations <br /> and will extend two feet above this screened interval. An annular seal will be constructed by <br /> installing 50 pounds of granular bentonite that will be hydrated with tap water and be allowed to <br /> 'Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.