Laserfiche WebLink
r <br /> Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-0200081 <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $184.54 per <br /> daily trip-end generated in the Tracy area. The fee shall be automatically adjusted July 1 <br /> of each year by the Engineering Construction Cost Index as published by the Engineering <br /> News Record. A credit may be allowed if it can be verified that the existing development <br /> on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:BN:sh <br /> PAC O M M E N T SVSAIYr 2002TA-02000 l.wpd <br /> r <br />