Laserfiche WebLink
-.'PPA 04-173 (UP) <br /> Page 2 of 2 <br /> t f C. j;tate on revised site plans the maximum number of employees and parishioners the sewage <br /> disposal system is being designed for. In addition, show on revised plans that the leach field <br /> area will be barricaded so it cannot be driven over, parked on, or used as a storage area. This <br /> leach field area must be used for that specific purpose only, and it cannot contain any <br /> underground utility lines (San Joaquin County Development Title, Section 9-1110.4(c)(5)). <br /> In addition, the revised site plan shall incorporate the 100% designed sewage disposal <br /> replacement area. <br /> i <br /> D. Construct water well under permit and inspection of the Environmental Health Department <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed four, a yearly permit to operate a <br /> public water system will be required b theEnvironmental ental Health Department(San Joaquin <br /> County Development Title, Section 9-1120.2 and 9-1115.9.). <br /> The supplier mustossess adequate quate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 through 116570. <br /> t <br /> I• <br /> ' h <br /> I <br />