Laserfiche WebLink
s � <br /> i N <br /> I <br /> G <br /> San Joaquin valley <br /> E Air Pollution Control District <br /> COMPLIANCE <br /> ASSISTANCE BULLETIN <br /> a September 2002 <br /> (Update from June 2002) <br /> Fugitive Dust Control at Construction Sites <br /> fI Reguiatiori VIl1l, Fudltive PM1`0"Prohlbitions,-of the l7isti=let's"Riiies and Regulations <br /> regulates activities that generate fugitive dust. Fugitive dust is emitted to the'air from open <br /> ground or caused by activities such as'excavation, transporting bulk materials, or travel on <br /> unpaved surfaces. "PM10" is a term applied to small sized particulate matter- microscopic <br /> 3 dust particles - in the air. The San Joaquin Valley currently exceeds the air quality <br /> standards for particulate matter. It is for this.reason that the District adopted <br /> in 1993. Significant amendments to Regulation VIII were adopted in 2001 and became VIII <br /> effective May 15, 2002. The following dust control and administrative requirements are <br /> applicable,at construction sites: <br /> I <br /> Visible Dust Emissions (VDE). Visible dust emissions may not exceed 20% opacity_ <br /> during periods when soil is being disturbed by equipment or wind at any tlme:' Dust control <br /> may be achieved by means of applying water before and during earth work and on traffic <br /> areas, phasing work to limit dust, and setting up wind fences to limit wind blown dust. VDE <br /> opacity of 20% means the amount of dust that would obstruct the view of an object by 20%. <br /> Soil stabilization. Soil stabilization is required at any construction site after normal working <br /> hours and on weekends and holidays. This requirement also applies to inactive <br /> construction areas such as phased projects where disturbed land is left unattended. <br /> Applying water to form a visible crust on the soil is an effective method for stabilizing a <br /> disturbed surface area. Long-term methods include applying dust suppressants or <br /> establishing.vegetative cover. Restricting vehicle access from the area will.help,.to maintain . <br /> a stabilized surface. information regarding stabilization standards and test methods are in <br /> Rule 8011 — General Requirements. <br /> Carryout and Trackout. These requirements are found in Rule 8041 — Carryout and <br /> Trackout. Carryout and trackout are materials adhered to vehicle tires and transport <br /> vehicles carried from a construction site and deposited onto a paved public road. Should <br /> carryout and trackout occur, it must be cleaned up at least daily, and immediately if it <br /> extends more than 50 feet from the exit point onto a paved road. The recommended clean- <br /> up methods include manually sweeping, sufficiently wetting the area prior to mechanical <br /> sweeping to limit VDE or using a.PM10-efficient street sweeper. A blower device, or dry <br /> sweeping with any mechanical device other than a PM 1 0-efficient street sweeper is <br /> prohibited: <br /> Northern Region Office Central <br /> 4230 Kiernan Avenue, Suite 130 Region Office %uthern Region office p <br /> Modesto. CA 95356-9321 1990 East Gettysburg Avenue 2700"M" Street, Slate 275 <br /> (209)557 400 ♦ FAX(20-9 557-6475 Fresno, CA 93726-0244 Bakersfield, CA 93301-2370 <br /> (559)230-6000 ♦ FAX(559)230-6062 (661)326-6900 ♦ FAX(661)326.6985 <br /> i <br />