My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011737 SSNL (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
23751
>
2600 - Land Use Program
>
PA-1800080
>
SU0011737 SSNL (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:23 AM
Creation date
9/4/2019 10:24:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0011737
PE
2626
FACILITY_NAME
PA-1800080
STREET_NUMBER
23751
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
25010003
ENTERED_DATE
4/2/2018 12:00:00 AM
SITE_LOCATION
23751 S BIRD RD
RECEIVED_DATE
3/30/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\23751\PA-1800080\SU0011737\SS STUDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,Percolation Test <br /> Sr7, k Construction ■ Stockton, California I rerracon <br /> April <br /> il 7, 2017 .Terracon Project No. NA177012 <br /> Summary of Percolation Tests. <br /> Percolation Percolation Comments <br /> Test No. Test Rate Test Duration <br /> (see notes) <br /> Date Tested Depth (inch) (minutes/inch) <br /> P1 Satisfactory percolation <br /> 42 41.66 4 hours rate <br /> March 15, 2017 <br /> Note: A satisfactory percolation rate is 60 minutes per inch or less for shallow leach lines and 30 minutes per inch or less for septic <br /> pits per SJEHD,Onsite wastewater Disposal Standards,October 2003. <br /> The clay loam soils within the 0 to 3.5 foot range of the proposed septic disposal area at the site <br /> demonstrate a satisfactory percolation rate for a standard septic system per EHD requirements. <br /> In general, septic system construction should follow the San Joaquin County On-Site Wastewater <br /> Disposal Standards where applicable. The on-site soil has relatively low permeability, hence even <br /> though not required, seepage pits may be installed at the end of the leach lines as a secondary <br /> absorption measure. <br /> Our professional services were performed, our findings obtained, and our recommendations <br /> proposed in accordance with generally accepted engineering principles and practices. This <br /> warranty is in lieu of all other warranties either expressed or implied. Test findings and statements <br /> of professional opinion do not constitute a guarantee or warranty, expressed or implied. <br /> We appreciate this opportunity to provide environmental services for the subject property. Please <br /> contact our office with any questions or concerns. <br /> Sincerely, <br /> Terracon Consultants, Inc. <br /> Lodi Office <br /> J(a,cla Wi� 4011111!51070111Y'00� <br /> Tamara K. Woods Garret S.H. Hubbart, Principal <br /> Field Environmental Scientist Geotechnical Engineer 2588 <br /> Attachments: Site Diagram <br /> Percolation Test Rate Form <br /> Onsite Wastewater Treatment System Permit <br /> Responsive ■ Resourceful ■ Reliable 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.