Laserfiche WebLink
Bird Road Facility Page 12 of 13 <br /> Project Number: E07183A <br /> November 30, 2007 <br /> II.4.2 Methods of Mitigation <br /> Because of the favorable result of the nitrate loading calculation, no mitigation measures are <br /> warranted. <br /> II.5 Conclusions and Recommendations <br /> In summary, percolation rates that meet the minimum EHD standards were achieved in the <br /> proposed septic disposal areas of each of the proposed parcels. Our office concludes that the <br /> Site is suitable for development with the use of a standard septic system. All septic system <br /> construction should follow the San Joaquin County On-Site Wastewater Disposal Standards <br /> where applicable. <br /> A groundwater boring was drilled by our office on March 8, 2007; ground water was <br /> encountered at approximately 14.5 feet below ground surface. The on-site water well was <br /> — tested for nitrate and DBCP. The results of these tests are forthcoming. <br /> III. LIMITATIONS <br /> Our professional services were performed, our findings obtained, and our conclusions proposed <br /> in accordance with generally accepted engineering principles and practices. This warranty is in <br /> lieu of all other warranties either expressed or implied. Test findings and statements of <br /> professional opinion do not constitute a guarantee or warranty, expressed or implied. <br /> r <br /> r <br /> r <br /> r <br /> v <br /> 902 Industrial Way•Lodi,CA 95240•209.367.3701 •Fax 209.369.4228 ©2007 Neil O.Anderson&Associates,Inc <br />