Monitoring Well Installation Report Page 5 <br /> Appendix A <br /> Project No.336.2 <br /> November 13, 1995 <br /> j.. i <br /> The well will be secured with a water tight locking cap encased within a traffic safe well box. A well <br /> =� construction schematic is attached as Figure 3. <br /> F -} Relative well collar elevations will be surveyed by a licensed land surveyor. <br /> 2.10 Monitoring Well Development <br /> E Within 48 hours of well installation after well sealing materials have had time toset,each monitoring <br /> well will be developed by mechanical surging and pumping until a clear stream is obtained. All <br /> down hole equipment will be decontaminated before and between uses. Development water will be <br /> removed from the well using either a bailer or a submersible pump and containerized in D.O.T. <br /> approved drums (labeled contents under analysis) to await proper disposition. After development <br /> the wells will be allowed to stabilize before they are purged and sampled <br /> 'I <br />