Laserfiche WebLink
t C) k <br /> F <br /> i (1) The applicant causes the excavation to become idle without an approved interim <br /> I + management plan for a period of 18 months or more; <br /> (2) The applicant files for bankruptcy; <br /> (3)" The County or State determines on the basis of annual inspections and reports <br /> that the applicant has not maintained compliance with the approved permit; <br /> (4) There arises an occurrence or circumstance which, in the opinion of the County <br /> j , or State;jeopardizes the site reclamation; or <br /> (5) The State makes one or more of the findings specified in Section 2774.4(a) of the <br /> State Public Resources Code, <br /> I� In any instance that the County or State makes the demand for partial or full tender of the <br /> financial guarantee of performance, the County and/or State may use all or any portion ' <br /> of the financial guarantee to reclaim the site and to recover its administrative costs <br /> associated therewith. (Development Title Section 9-1415.21r}) i <br /> r. In pits used to store excess flood flows from Lone Tree Creek,agricultural chemicals that <br /> could'contaminate groundwater to,the point of impairing beneficial uses shall not be ° <br /> applied before April 1 of each calendar year or after the last date that the material could ' <br /> X31 be applied and still decompose to negligible residual concentrations in the soil by ' <br /> �{! December 1. Nitrogen shall not be applied in excess of crop uptake, particularly in the <br /> " fall. <br /> I <br /> S. Submit for approval to Development Services Division and the appropriate affected <br /> i agencies the detailed plans and specifications to apply for encroachment permits <br /> concerning any proposed conveyor and/or excavation equipment crossings over or under <br /> Interstate 5, the California Aqueduct, Lone Tree Creek, Blewett Road, Hetch Hetchy <br /> pipeline, PG&E pipelines, Chevron USA Inc. pipeline, or any other easements. i <br /> t The excavator shall cease all construction and excavation work immediately upon the <br /> discovery of cultural resource materials. Such work shall cease until the excavator has <br /> compiled with the requirements of Appendix K of the CEQA Guidelines. <br /> U. The excavator shall implement the folkowing measures to reduce the impact of <br /> construction-related noise: ! <br /> i <br /> i (1) All equipment shall have sound control devices no fess effective than those ' <br /> provided on the original equipment. No equipment shall have exhaust systems <br /> without mufflers. !i <br /> (2) No piledriving activities shall be performed within 3,000 feet of an occupied <br /> I dwelling unit between the hours of.7:00 p.m. and 7:00 am. No blasting <br /> operations shall be permitted as a part of this approval. <br /> I <br /> Conditions of Approval - 8 - QX-91-5 <br /> 1 <br />