Laserfiche WebLink
f' <br /> To Planning Commission <br /> 4 From: Thomas Gau <br /> Sub QX-91-5 (Teichert) <br /> F Date: 9-16-93 <br /> Page. - 4 - <br /> ATTACHMENT B <br /> LONE TREE QUARRY EIR <br /> REVISED MITIGATION MONITORING PROGRAM <br /> (For Significant Impacts) <br /> riiOIITORING REQREMEN r <br /> MITIGATION MEASURES <br /> RESPONSIBLE- AGEL�ICY.r , & TI�fIN <br /> C. BIOTA• <br /> 1. The excavator shall meet Implementation (ET4�; aDFG. <br /> the- equ--eme.nts_ the USFWS) <br /> Department ef Fish a <br /> Gafae and the 74. S. pi The mitigation measure will be <br /> and Wildlife 11, . <br /> a condition of approval of the <br /> Quarry Excavation application. <br /> ef—the a-ppreved usetake <br /> no actions that violate Monitoring (California <br /> =:{ the provisions or Department of Fish and Game, <br /> regulations of the State U.S. Fish and Wildlife <br /> or Federal Endangered Service) <br /> Species Acts. <br /> i° <br /> -n-itiatlen q94 the appzev-e-d <br /> i <br /> i� <br /> use. The excavator shall <br /> congly with applicable State <br /> and Federal laws. <br /> 1 <br />