Laserfiche WebLink
0i Melanie J. Halajian, AICP <br /> Associate Planner <br /> I <br /> Fi • City of Tracy, Storm Drain Master Plan Supplement No. 1 (Westside Channel Outfall System). <br /> Assistant Project Manager for controversial project involving existing and planned system of open <br /> channels, storm drains and detention basins within the Westside Channel Watershed. <br /> ■ Placer County, Eaglewood EIR. Project Planner for the 475-acre Eaglewood project consists of 184.6 <br /> acres of residential development (470 dwelling units) including single-family and single-family <br /> ` townhomes; 5 acres of village center; 276.8 acres of open space that consists of 151.4 acres of open <br /> space, 6.7 acres of.park, 11.5 acres for the clubhouse site, an 18-hole golf course on 106 acres, and <br /> 1.2 acres of golf course maintenance facilities; and 8.6 acres of roadways. The proposed project <br /> includes development of internal roadways, public and private trails, a single gated entrance, <br /> emergency access points, water supply improvements, connection to the regional sewer system, and <br /> improved storm drainage facilities. This project is located in close proximity to the Truckee River, <br /> which is a 303d-listed waterway. <br /> } Placer County, Hopkins Ranch EIR. Project Planner for 87-single-family residential units, golf course, <br /> driving range, and clubhouse within the Martis Valley in close proximity to the Truckee River, a <br /> a 303d-listed waterway. <br /> ■ Calaveras County, Oak Canyon Ranch Specific Plan EIR. Project Planner for Specific Plan which <br /> proposed 2,275 single-family residential units, golf courses, a Village Center with high density <br /> sresidential uses, and public services. <br /> Placer County, Northstar Village EIR. Project Planner for the environmental review of the expansion <br /> of Northstar Village including intensification of retail, office, resort and residential uses. <br /> ■ United States General Services Administration, Sacramento Federal Building/United States <br /> 1 Courthouse EIS. Project Planner for environmental analysis including evaluation of traffic and <br /> } parking impacts and a cultural resources study that included onsite excavation and recovery of <br /> artifacts. <br /> EI Dorado County, Wal-Mart Project EIR. Project Planner for environmental review of a 129,000 sq. <br /> foot Wal-Mart store on 19.8 acres in an emerging urban area. <br /> i <br /> � ■ Missouri Flat Master Circulation and Funding Plan for the Sundance Plaza and EI Dorado Villages <br /> �.;. Shopping Center Projects EIR. Project Planner for the environmental review o_ f a Master Circulation <br /> and Funding Plan and two retail projects. <br /> • California Department of Mental Health, Napa State Hospital EIR. Project Planner for environmental <br /> �- review of various security improvements as well as aesthetic issues at the State Hospital.. <br /> { f ■! Statewide Electrified Fence Project Section 10(a)(1)(B) Incidental Take Permit. As Project Planner <br /> �f assisted with preparation of an EIR involving a Habitat Conservation Plan to serve as mitigation for <br /> incidental takes associated with implementation of the statewide electrified fence project at prisons <br /> Fthroughout California. <br /> ■ Aerojet Open Burn Treatment Complex EIR. Project Planner for preparation of EIR for proposal of <br /> permitting and closure of individual hazardous waste treatment units at the Aerojet Open Burn H <br /> Treatment Complex, an 8,500 acre piece of land in unincorporated Sacramento County. Key issues <br /> involved were land use and public services. <br /> ■ Mallard Slough Pump Station EIR. Project Planner for the initial Study and Mitigated Negative <br /> I Declaration for the Mallard Slough Pump Station that included replacement of an existing pump and <br /> �Y <br /> Page 2 <br />