Laserfiche WebLink
j <br /> M <br /> it <br /> (9) Gravel strips,'or wheel washers shall be installed where vehiieles-enter and.exI <br /> unpaved roads onto paved roads: <br /> -All internal roads planned for long-term use shall be paved: <br /> (11) Excess;fugiti.ye windblown dust shall be prevented by planfing the proposed row <br /> crops as quickly as,possible after excavation activities for each phase have been <br /> completed. <br /> `(12). All on-site equipment driven by internal combustion engines shall be properly <br /> maintained and well tuned according to manufacturers' specifications. <br /> Maintenance records demonstrating this shall 'be kept on the <br /> site .by the <br /> proponent and shall be made available to the County upon request. <br /> (13) Employees shall be encouraged to ride share or carpool to the job'site to reduce <br /> the amount of vehicle traffic to and from the project area. <br /> (14) - During smog season (May through October), the construction period shall be <br /> lengthened to minimize the number of vehicles and equipment operating at the <br /> same level. <br /> (15) When available, clean diesel powered or electric equipment shall be utilized in <br /> lieu of gasoline powered engines. <br /> $. U.S. FISH AND WILDLIFE SERVICE: (Staff Contact: Sheila Larson, (916) 979-2725) <br /> a. ENDANGERED SPECIES ACT: In carrying out the operation of the project, the <br /> applicant shall take no actions that-violate the provisions of the State or Federal <br /> Endangered Species Act or any regulations promulgated pursuant thereto. Compliance <br /> with said laws shall be the sole responsibility of the applicant, and the applicant agrees to <br /> indemnify, defend, and hold the County harmless from and against any claim or action <br /> by affected State or Federal agencies as to the project's compliance with said laws. <br /> b. SAN JOAQUIN COUNTY MULTI-SPECIES HABITAT CONSERVATION AND OPEN <br /> SPACE PLAN (SJMSCP): As an alternative to the preparation of a separate HCP, the <br /> applicant may participate in, and provide mitigation through the SJMSCP. <br /> 6. STATE DEPARTMENT OF FISH AND GAME: (Staff Contact: Dan Gifford, 369-8851) <br /> a. PRECONSTRUCTION SURVEYS: Within 60 days prior to the beginning of construction <br /> activities, or any project activity likely to impact the burrowing owl, kit fox, andlc <br /> Hospital Creek corridor habitat, the proponent shall retain a qualified biologist to condi: <br /> a preconstruction survey of the affected area. <br /> I <br /> i <br /> I <br />