My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012813
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
37400
>
2600 - Land Use Program
>
EIR-96-02
>
SU0012813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 10:34:08 AM
Creation date
9/4/2019 10:29:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012813
PE
2675
FACILITY_NAME
EIR-96-02
STREET_NUMBER
37400
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
2651206
ENTERED_DATE
1/8/2020 12:00:00 AM
SITE_LOCATION
37400 S BIRD RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\37400\EIR-96-02\EIR.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` near the Bird Road - Interstate 580 overcrossing and return via the same route once loaded. Speed <br /> along Bird Road is near 45 to 55 MPH at the fastest point. <br /> Measurements in the area of the generator and rock crusher show them to be somewhat greater in <br /> noise production than the other major components of the sand plant. However, in the present location <br /> of the plant, even these levels do not extend beyond the noise impacts of the adjacent freeway. The <br /> 65 CNEL, calculated without considering the embankment between it and the freeway, extend no <br /> further than to the lanes closest to the plant. When the effects of the embankment are considered, the <br /> 65 CNEL will not extend significantly beyond the property line of the plant. While the 65 dBA <br /> Maximum Noise Level of the rock crusher extends beyond the property line of the Sand Plant, the <br /> area in which this level is exceeded is all within the bounds of the Interstate Highway. No area which <br /> could be permanently occupied by human beings outside the plant will receive noise above the 65 <br /> dBA level. <br /> TABLE 1. <br /> Time of measurements made in vicinity of <br /> the rock crusher <br /> Run No Time Location Noise level <br /> Run 1 1047 approx 75 ft to generator 74 db <br /> Run 2 1049 35 ft to generator, idle power 80 db <br /> Run 3 1051 100 ft perpendicular to rock crusher, idle 69 db <br /> Run 4 1056 top of embankment above crusher, idle 64 db <br /> Run 6 1059 same, crusher running 74 db <br /> -- Run 7 1104 100 ft, 45 degree angle to crusher 73 db <br /> Run 9 1106 50 ft, same direction 79 db <br /> Run 10 1107 25 ft, same direction 83 db <br /> Run 11 1109 30 ft, toward embankment from crusher 81 db <br /> Run 12 1111 100 ft, perpendicular to conveyers south 78 db <br /> Run 13 1113 50 ft, same direction 83 db <br /> Run 14 1114 3 5 ft, generator at power 82 db <br /> Mining operations of the raw material for the Sand Plant will not be of a nature that will cause the <br /> noise levels outside the boundaries of the plant owned land to increase to adverse levels. The <br /> intermittent operation of the mining equipment near the one residence that is adjacent to phase four <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.