Laserfiche WebLink
_ C. Hydrology: <br /> See Hydrology Report - Appendix endix A <br /> Y gY p <br /> D. Soils Assessment <br /> See Soils Report - Appendix B <br /> r' E. Vegetation/Wildlife: <br /> See Sensitive Plant & Animal Species Study - Appendix C <br /> F. Cultural Resources <br /> See Cultural Resources Study - Appendix D <br /> �, G. Noise <br /> See Noise Study - Appendix E <br /> r <br /> II. DESCRIPTION OF PROPOSED MINING OPERATION <br /> A. Map of Operation - See Attached <br /> B. Production Schedule: The currently permitted design capacity of the processing plant per <br /> SJVUAPCD's permit is 1,106,560 tons per year. <br /> Phase Material (Tons) Value <br /> 1 22 000,000 $1,100,000 <br /> 2 28,000,000 $1,400,000 <br /> 3 21,000,000 $1,050,000 <br /> 4 24,000,000 $1,200,000 <br /> Total 95,000,000 $4,750,000 <br /> r- <br /> C. Mining Plan: <br /> 1, Operating Plan: Current permit expires in 1996. Mining will be continued upon approval of <br /> this application year round. <br /> 2. See Soils Report - Appendix B pp 6-8 <br /> 3. Overburden/Waste/Ore: <br /> �x <br />